My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02091999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 02091999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:06:33 PM
Creation date
12/30/2015 4:06:21 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 02091999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reimbursable Expense <br /> Reproductions <br /> 12/22/98 Engineering Repro Systems Invoice No.00219381 226.81 <br /> Postage&Delivery <br /> 01/11/99 On Time Delivery Service Delivery Charge 18.25 <br /> Total Reimbursables 245.06 245.06 <br /> Billing Limits Current Prior .To-date <br /> Total Billings 8,614.56 .68,352.88 76,967.44 <br /> Limit 77,150.00 <br /> Remaining 182.56 <br /> Total this invoice $8,614.56 <br /> Comments: <br /> The estimated cost to complete engineering services for the 1999 Street Reconstruction project <br /> was $61,700.The total project cost to complete the final design and to prepare plans and <br /> specifications is$76,967.44.The$15,300 in costs over the estimated $61,700 consisted of <br /> survey, preliminary design, and soil testing for 29th Avenue.The City will be credited $15,300 <br /> in services on the 2000 Street Reconstruction project. <br /> Approved by: ��- <br /> Principal: Peter Willenbring <br /> Project Manager:Todd Hubmer <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.