Laserfiche WebLink
MAR-17-1999 17 01 WSB & ASSOCIATES INC. 6125411700 P.0:31b- <br /> Mr. Michael Mornson <br /> City of St. Anthony <br /> March 17, 1999 <br /> Page 2 <br /> A Geotechnical Engineer wi11 provide recommendations to address property owners <br /> concerns about subsurface conditions. <br /> M. Prepare preliminary plan. <br /> This task consists of consolidating the dialog generated through the public meeting <br /> process to into a preliminary plan. The preliminary plan will then be presented to the <br /> homeowners through the neighborhood meeting process and feedback will be generated <br /> and adjustments made until a reasonable consensus is reached on the configuration of <br /> the stormwater holding basin. Upon reaching a reasonable consensus, a digital image <br /> of the proposed project will be created and presented at the public hearing to the City <br /> Council and affected property owners. <br /> The above Scope of Services anticipates the cooperation of the affected homeowners in <br /> developing a preliminary plan for the second stormwater storage area within the City of <br /> St. Anthony. Should cooperation not be obtained in developing the preliminary plan it is <br /> recommended that the City proceed with property acquisition prior to survey and soil boring <br /> task of the preliminary plan development. <br /> It is estimated that the cost to complete the above services is approximately$19,500. This <br /> cost will be billed on an hourly basis and we will notify the City should these tasks exceed <br /> the estimated cost. <br /> If you have any questions please do not hesitate to contact us at 612-541-4800. <br /> Sincerely, <br /> WSB &Associates, Inc. <br /> Peter R. Willenbring, P.E. Todd E.Hubmer, P.E., <br /> Vice President Project Engineer <br /> lv <br /> P1WPWIMIM.S dA MI700.nne, "A <br /> TOTAL P.03 <br />