My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03231999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 03231999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:07:14 PM
Creation date
12/30/2015 4:07:02 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 03231999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> DATE.: March 19, 1999 <br /> TO: Mike Mornson, City Manager <br /> FROM: Jay Hartman,Public Works Director <br /> RE: Water Tower Park <br /> The city of St. Anthony Parks Commission have completed the design and specification <br /> requirements for the new Water Tower Park playground area. The engineering estimate <br /> for the multi-age playground is approximately$248,000. This estimate does not include <br /> engineering costs incurred by BRW. <br /> The proposed schedule for the construction of the park is as follows: <br /> March 23 City Council authorizes advertisement of bids. <br /> March 29 Construction plans available to contractors. <br /> April 12 Bid opening 1:OOPM. <br /> April 13 City Council awards construction contract. <br /> April 30 Contractor delivers play equipment designs to City for <br /> Parks Commission review and selection. <br /> May 7 Public Works Director informs contractor of play <br /> equipment design/manufacturer selection. <br /> July 19 Park construction is complete. <br /> To date,the City Council has authorized BRW to proceed through the bid-opening <br /> portion of this project. Bob Kost has submitted a proposal for the construction related <br /> services needed to complete this project. <br /> The Parks Commission along with Bob Kost from BRW will be presenting the proposed <br /> plan to the City Council on March 23, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.