My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06081999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 06081999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:08:35 PM
Creation date
12/30/2015 4:08:26 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 06081999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> • applicant shall agree(in manner,amount,and substance acceptable to the City)to pay such <br /> fees within 30 days of billing therefor. All permit fees shall be doubled during a <br /> probationary period. Permit fees that were paid for a permit which was revoked for a breach <br /> are not refundable. Any refunded permit fees shall be less all City cost up to and including <br /> the date of refund. <br /> Subd.4. Use of Permit Fees. All obstruction and excavation permit fees shall be used solely <br /> for City management, construction, maintenance and restoration costs of the right-of-way. <br /> Section 1165.13. Right-of-Way Restoration. <br /> Subd. 1. Timiniz. The work to be done under the excavation permit, and the repair,and <br /> restoration of the right-of-way as required herein, must be completed within the dates <br /> specified in the permit, increased by as many days as work could not be done because of <br /> extraordinary circumstances beyond the control of the permit holder or when work was <br /> prohibited as unseasonable or unreasonable under Section 1165.16, Subd. 2. In addition to <br /> repairing its own work,the permit holder must restore the general work area of the work,and <br /> the surrounding areas, including the paving and its foundations, to the same condition that <br /> existed before the commencement of the work and must inspect the area of work and use <br /> reasonable care to maintain the same condition for 36 months thereafter. <br /> Subd. 2. Repair and Restoration. The permit holder shall repair its own work. In addition, <br /> • in its application for an excavation permit,the permit holder may choose either to have the <br /> City restore the right-of-way or to restore the right-of-way itself. <br /> (a) City Restoration. If the permit holder chooses to have the City restore the right- <br /> of-way, the permit holder shall pay the costs thereof within 30 days of billing. If, <br /> during the 36 months following such restoration, the pavement settles due to the <br /> permit holder's improper backfilling,the permit holder shall pay to the City,within <br /> 30 days of billing, the cost for the resultant degradation as well as for any and all <br /> additional City costs associated therewith. <br /> (b) Permit Holder Restoration. If the permit holder chooses at the time of <br /> application for an excavation permit to restore the right-of-way itself, the permit <br /> holder shall post an additional performance and restoration bond in an amount <br /> determined by the City to be sufficient to cover the cost of restoring the right-of-way <br /> to its pre-excavation condition. If, 36 months after completion of the restoration of <br /> the right-of-way, the City determines that the right-of-way has been properly <br /> restored,the surety on the performance and restoration bond posted pursuant to this <br /> subdivision shall be released. <br /> Subd. 3. Standards. The permit holder shall preform the work according to the standards <br /> and with the materials specified by the City. The City shall have the authority to prescribe <br /> -11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.