My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06081999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 06081999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:08:35 PM
Creation date
12/30/2015 4:08:26 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 06081999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• excavated shall mark the horizontal and approximate vertical placement of all said equipment. Any <br /> registrant whose equipment is less than 20 inches below a.concrete or asphalt surface shall notify <br /> and.work closely with the excavation contractor in an effort to establish the exact location of its <br /> equipment and the best procedure for excavation. <br /> Section 11.6.28. Damage to Other Equipment. <br /> Subd. 1. Maintenance Work by City. When the City performs work in the right-of-way and _ <br /> finds it necessary to maintain, support,or move a registrant's equipment in order to protect <br /> it,the City shall notify the local representative as early as is reasonably possible. The costs <br /> associated'therewith will be billed to that registrant and must be paid within 30 days from <br /> the date of billing. <br /> Subd. 2. Responsibility of Re ism Each registrant shall be responsible for the cost of <br /> repairing any equipment in the right-of-way which it or its equipment damages. Each <br /> registrant shall be responsible for the cost of repairing any damage to the equipment of <br /> another registrant cause during the City's response to an emergency occasioned by that <br /> registrant's equipment. <br /> Section 1165.29. Right-of-Way Vacation. <br /> Subd. 1. Reservation of Right. If the City vacates a.right-of-way which contains the <br /> • equipment of a registrant,and if the vacation does not require the relocation of registrant or <br /> permit holder equipment, the City shall reserve, to and for itself and all registrant having <br /> equipment in the vacated right-of-way, the right to install, maintain and operate any <br /> equipment in the vacated right-of-way and to enter upon such right-of-way at any time for <br /> the purpose of reconstructing, inspecting, maintaining or repairing the same. <br /> Subd. 2. Relocation of Equipment. If the vacation requires the relocation of the registrant <br /> or permit holder equipment and;(a)if the vacation proceedings are initiated by the registrant <br /> or permit holder, the registrant or permit holder must pay the relocation costs; or(b) if the <br /> vacation proceedings are initiated by the City and the registrant or permit holder must pay <br /> the relocation costs unless otherwise agreed to by the City and the registrant to permit holder; <br /> or(c)if the vacation proceeding are initiated by a person or persons other than the registrant <br /> or permit holder, such person or persons must pay the relocation costs. <br /> Section 1165.30. Indemnification and Liability. <br /> Subd. 1. Limitation of Liability. By reason of the acceptance of a registration or a grant of <br /> the right-of-way permit, the City does not assume any liability; (a) for injuries to persons, <br /> damage to property,or loss of service claims by parities other than the registrant or the City; <br /> or (b) for claims or penalties of any sort resulting from the installation, presence, <br /> maintenance, or operation of equipment be registrants or activities of registrants. <br /> • -21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.