My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06221999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 06221999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:08:50 PM
Creation date
12/30/2015 4:08:38 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 06221999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Proposed Improvements <br /> 4.1 Sanitary Sewer <br /> ' In order to convey the anticipated peak wastewater flow and reduce the <br /> basement backups, the existing sanitary will be removed and reconstructed <br /> with larger pipe at the current location. The segment on 291h Avenue from <br /> Wilson Street to CSAH 88 will be reconstructed with 12-inch PVC pipe. <br /> 1 <br /> The proposed sanitary sewer improvements are shown on Figure 2 in <br /> Appendix A. <br /> 4.2 Watermain <br /> The existing water mains will be entirely or partially exposed by the <br /> excavation required for the sanitary sewer and storm sewer improvements. <br /> ' In addition, many of the water service lines to the individual properties will be <br /> removed or disconnected for a period of time. The excavation for the other <br /> utilities provides a timely opportunity for improvements to the water <br /> distribution system before significant problems are experienced. <br /> The proposed water main improvements consist of replacing the existing 6- <br /> ' inch mains with new 8-inch ductile iron pipe mains and copper service taps <br /> and lines. This will improve delivery of potable water and fire flow volume at <br /> reasonable pressure and head loss. <br /> ' Replacement of the service taps and lines should improve the water quality <br /> by reducing the potential for lead to enter the system and possibly increase <br /> ' the pressure by providing a clean service pipe. <br /> The proposed water system improvements are shown on Figure 3 in <br /> ' Appendix A. <br /> 4.3 Storm Sewer <br /> The proposed storm sewer improvements include replacing the 36-inch RC <br /> pipe at the intersection of Wilson Street and 29th Avenue with a 66 7inch RC <br /> pipe. Water will be diverted to the east into the storm water storage basin at <br /> Silver.Point Park. For storm events which exceed the capacity of the new <br /> storm sewer system, the existing overland overflow route will be maintained. <br /> ' Additional catch basins are proposed forthe 29th Avenue intersections of and <br /> new storm sewer are proposed at Roosevelt Street,Wilson Street,and Silver <br /> Lake Road-to reduce the occurrence flooding. <br /> 1 . <br /> City of St.Anthony AL <br /> 2000 Street 8 Utility Improvement Project WS'B <br /> Feasibility Report <br /> WSB Project No. 1065.25 <br /> ' Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.