My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06221999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 06221999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:08:50 PM
Creation date
12/30/2015 4:08:38 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 06221999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1. Executive Summary <br /> 1 This project has been entitled the 2000 Street and Utility Improvement Project. This <br /> project provides for the street and utility reconstruction of 29'h Avenue from Wilson <br /> Street to Crestview Drive. This study also includes a breakdown of costs to <br /> 1 reconstruct 291h Avenue from Stinson Boulevard to County State Aid Highway <br /> (CSAH) 88. <br /> 1 This Feasibility Report outlines the proposed construction of approximately 3,600 <br /> feet of 40-foot urban section streets, complete with bituminous paving and concrete <br /> curb and gutter. Also proposed is the replacement of approximately 3,600 feet of <br /> water main and 2,800 feet of sanitary sewer main, approximately 75 water services, <br /> and the installation of 3,000 feet of storm sewer ranging from 15 inches to 72 inches <br /> 1 in diameter. <br /> The engineer's opinion of probable project cost is $1,659,000 for reconstruction of <br /> ' 291h Avenue between Wilson Street and Crestview Drive and $2,633,000 for 29`h <br /> Avenue from Stinson Boulevard to CSAH 88. Funding for the project will come <br /> from bonds issued against Municipal State Aid funds and storm water utility funds. <br /> 1 The project reconstruction can be completed, including the first lift of bituminous <br /> and all restoration items, in 2000. The final lift of bituminous is proposed to be <br /> 1 installed in 2001. <br /> This project is feasible, necessary, and cost effective from an engineering <br /> 1 standpoint and should be constructed as proposed herein. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 City of St.Anthony <br /> 2000 Street&Utility Improvement Project WS'B <br /> Feasibility Report <br /> eAx� <br /> WSB Project No. 1065.25 <br /> 1 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.