My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05092000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 05092000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:13:49 PM
Creation date
12/30/2015 4:13:39 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 05092000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br /> law <br /> IdEff 3535 Vadnais Center Drive,200 SEH Center,St.Paul, MN 55110-5108 651.490.2000 651.vd0.2 i 50 rAA <br /> architecture engineering environmental transportation <br /> April 24, 2000 RE: St. Anthony,-Minnesota <br /> Emergency Vehicle Preemption <br /> Proposal for Engineering Services <br /> SEH No. P-SANTH0005.00 <br /> Mr. Jay Hartman <br /> Director of Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Dear Mr. Hartman: <br /> Short Elliott Hendrickson,Inc. (SEH)is pleased to submit this proposal for design and construction services <br /> related to 8 Emergency Vehicle Preemption (EVP) systems within the City of St. Anthony. <br /> SEH has extensive traffic engineering, transportation planning, and design experience, and is familiar with <br /> traffic signal design,preemption design,preemption equipment, and all associated requirements(including <br /> those of Mn/DOT, Hennepin and Ramsey Counties, and the City of Minneapolis). Since 1978, SEH has <br /> . . <br /> -prepared designs for over 300 signal systems throughout the State of Minnesota. We have also prepared <br /> .plans for more than 200 EVP installations on existing signal systems. A listing of recent EVP installation <br /> locations,along with contact persons from each agency, is enclosed with this submittal. Our understanding <br /> .of local agency requirements and philosophies,along with our extensive signal design experience,will help <br /> in completing timely and proper designs for each intersection. <br /> Our proposal responds to your request for proposal. As a first step in our work program, we will review <br /> each intersection with City personnel to assure that analysis and design fit each intersection's specific needs. <br /> After review and agency inputs,we will prepare a preliminary letter report to the City,detailing anticipated <br /> costs to install each EVP system. Final design, submittal to the appropriate agencies, and construction <br /> services will also be performed by SEH. We propose to complete all work related to the design and <br /> construction observation of each EVP system for a not-to-exceed cost of$8,000. We will work with the <br /> City to establish and meet schedules as required in a cost effective manner. <br /> We appreciate the opportunity to present this proposal and look forward to working with the City of <br /> St.Anthony. <br /> Respectfully submitted, <br /> ohn M. Gray, P.E:- <br /> Project Engineer <br /> jmg <br /> SATRANS\I PROlECPP•TW-AN-WROPLM WPD <br /> Short Elliott Hendrickson Inc. Offices located throughout the Upper Midwest Equal Opportunity Employer <br /> We help you plan,design,and achieve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.