My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11142000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 11142000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:18:28 PM
Creation date
12/30/2015 4:18:19 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 11142000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• GAC Plant <br /> • General Construction: <br /> • Steel frame;brick veneer and pre-finished metal panel wall with painted CMU back-up wall; <br /> steel bar joist roof structure <br /> • Past improvements: <br /> • New epoxy flooring and newly painted ceiling <br /> • Exterior grading/drain-tile work due to water infiltration through below-grade exterior wall <br /> • Function/Condition of Building: <br /> • Constructed in 1991. Appears in excellent condition and is functioning well <br /> • Presence of water seepage through block wall despite exterior improvements listed above <br /> • Main Water Filtration Plant: <br /> • General Construction: <br /> • Brick veneer with painted CMU back-up wall;pre-cast concrete plank roof structure <br /> • Function/Condition of Building. <br /> • Constructed in 1950's. Structurally sound and is functioning adequately <br /> • Requires continuing and increasing maintenance <br /> • Access for pump removal is not adequate <br /> • Evidence of moisture seepage and mineral deposits on interior of CMU walls <br /> I <br /> Water Filtration Plant—Entrance Water Filtration Plant—Interior <br /> • Filtration Plant attached buiWines: <br /> • Chlorine Room: <br /> • General Construction: <br /> • Brick veneer with painted CMU back-up wall;built-up roof <br /> • Attached to the Filtration Plant near the office area,but no direct access between <br /> • Function/Condition of Building: <br /> • Exterior access to the chlorine room is not adequate for material delivery <br /> • Material storage area is relatively small and cramped <br /> • Warming House: <br /> • General Construction: <br /> • Brick veneer with painted CMU back-up wall;built-up roof <br /> • Attached to the Filtration plant near the office area with direct access between <br /> (through a locked storage room) <br /> • Contains a vaulted ceiling area with clerestory windows <br /> • Function/Condition of Building: <br /> • Public restrooms are not handicap accessible <br /> • Evidence of roof leaks around vaulted ceiling despite roof repairs <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.