Laserfiche WebLink
10/22/2002 <br /> Water and Sanitary Sewer Systems Recommended Improvements <br /> PRELIMINARY <br /> OPINION OF <br /> PROBABLE <br /> RECOMMENDED IMPROVEMENT PRIORITY YEAR COST <br /> 1. Sanitary sewer replacement south of 271 - <br /> Avenue to Minneapolis High 2003 $6139000 <br /> 2. Construct new 10-inch water main at Kenzie <br /> Terrace High 2003 $4299000 <br /> Renovate chemical room at water treatment <br /> 3- facility High 2003 $9339000 <br /> 4. Improve electrical service and motor controls at <br /> well houses 3, 4 and 5 High 2004 $454,000 <br /> 5. System wide controls and telemetry 2004- <br /> improvements Medium 2006 $285,000 <br /> 6. Replace sanitary sewer in Apache Plaza area Medium 2005- <br /> dependent upon development) 2006 $155809000 <br /> 7. Re-wire and re-pipe high service pumps 3 and 4 Medium 2005- $5379000 <br /> 2006 <br /> 8. Prepare a water security strategy plan Medium 2004 With City <br /> 9. Televise sanitary sewer lines in Kenzie Terrace <br /> $ <br /> Medium 2003 $59000 <br /> area <br /> CAMyFiles\Work\St.Anthony\combined improvements summary table.doc <br />