My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10142003
StAnthony
>
City Council
>
City Council Packets
>
2003
>
CC PACKET 10142003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:58:17 PM
Creation date
12/30/2015 7:58:08 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 10142003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> KRAUS-ANDERSONe CONSTRUCTION COMPANY <br /> S CONTRACTORS & CONSTRUCTION MANAGERS <br /> October 8, 2003 <br /> Michael Morrison <br /> City Manager <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony,MN 55418 <br /> Re: St. Anthony Fire Station/St. Anthony Public Works <br /> St. Anthony,Minnesota <br /> Dear Mr. Morrison: <br /> As Construction Manager for the City of St. Anthony, Kraus-Anderson©Construction <br /> Company, Midwest Division would like to make its recommendations to the City for the <br /> consideration of bids received recently for the Fire Station and Public Works projects. As <br /> you know, the City has previously awarded bids for Site Utilities, Earthwork, Footings, <br /> Foundations and long-lead structural items for both projects, and the sitework at both <br /> locations is well underway. <br /> Recently we received bids for BP-2, which is for the building completion, mechanical and <br /> electrical construction for both projects. The Fire Station bids were received on <br /> September 23, 2003 and the Public Works bids were received on September 25,2003. <br /> The total recommended award amount for the Public Works BP-2 Bid Division Nos. 1 <br /> through 23, including Alternate Nos.. 7,8,9,10 is $1,389,774.00. In addition, we are <br /> proposing the acceptance of other value engineering and cost reduction items as <br /> developed by the project team. <br /> It should be noted that accepting deduct Alternate No. 10 will result in the deletion of <br /> about 4,300 sq.ft. of building that includes Public Works Shop and Utility Storage Areas, <br /> as well as Police Squad Car and Vehicle Storage (see attached drawing). However, the <br /> value of this deduct is $157,000.00 and this amount is needed to cover• the costs of <br /> dealing with the unsuitable and contaminated soils encountered in the excavation portion <br /> of BP-l. Awarding these bids and acceptance of the value engineering/cost reduction <br /> items will result in a total cost amount, within the approved construction budget amount <br /> of$2,400,000.00. <br /> Midwest Division <br /> 8625 Renclova Street, Circle Pines, MN 55014 <br /> Phone:(763) 786-7711 Fax: (763) 786-2650 <br /> Equil Opporkinity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.