My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09151987
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1987
>
PL PACKET 09151987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:35:52 PM
Creation date
12/30/2015 3:35:39 PM
Metadata
Fields
SP Box #
15
SP Folder Name
PL PACKETS 1987
SP Name
PL PACKET 09151987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1 Siting <br /> 2 Would wrap the buildings around the exterior and create a <br /> 3 focal point in the •middle with an entryway off Kenzie Terrace <br /> 4 to accept this project rather than the Walker Senior . project;. , <br /> 5 <br /> 6 would do a lot .with landscaping around the retention pond. <br /> 7 Parking <br /> 8 Said would provide 206 parking stalls in underground garages; <br /> 9 177 on the surface plus another 27 ancillary spaces to. meet <br /> 10 ordinance requirements. <br /> 11 Buildings <br /> 12 Three 3 story, with a total of 201 units ; <br /> 13 Building A, 96 units ; Building B, - 51 units ; and Building C, 54 <br /> 14 units; <br /> 15 all three would have brick exteriors- with wood as an accent <br /> 16 principally around balconies - to avoid "institutional look" to <br /> 17 the buildings; <br /> •18 hip roofs would look more residential and would be easier to <br /> 19 keep snow off in this climate; <br /> 20 balconies would be pulled out from the buildings and lots of- <br /> 21 angles would be provided because from a marketing standpoint <br /> 2'2 these are very important. <br /> 23 Phasing <br /> 24 Said would clear site as soon s City acquires it. Said under- <br /> 25 stood that would be sometime after. September 15th; <br /> 26 would start construction as soon as possible in the spring <br /> 27 by 'April 1st', but sooner if weather, demolition and site <br /> 28 preparation permitted; <br /> 29 would construct Building A, the larger building with 96 units <br /> 30 of market rent first, but at same time would start Building C <br /> 31 which would be rented for 55 and over ; <br /> 32 leasing would start around the middle of December, 1988 , but <br /> 33 wouldn' t anticipate buildings would be filled up until June or <br /> 34 July, 1989 ; <br /> 35 Building B -would be started in the spring of 1989 . Lang- <br /> 36 Nelson plans. it -for 55 and .over' but wants the option :of <br /> •37 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.