My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11151994
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1994
>
PL PACKET 11151994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:28:58 PM
Creation date
12/30/2015 5:28:49 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1994
SP Name
PL PACKET 11151994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> STAFF REPORT <br /> DATE: October 19, 1994 <br /> TO: Michael Mornson, City Manager <br /> FROM: Larry Hamer, Public Works Director <br /> ITEM: VARIANCE FOR CUB FOODS <br /> The roe presently owned b C. G. Rein at Apache Plaza i i • <br /> property rty p y y p s going to be <br /> split and re-platted on the south side of the existing mall. <br /> CUB Foods will need to obtain approval of a set back variance of 15 feet to <br /> allow construction of their building on the north end of the CUB property as <br /> zero lot line placement. According to the Uniform Building Code, if the <br /> structure is placed on the lot away from the Apache property, CUB would need <br /> 60 feet on all sides from any structure. However,-if the structure is--placed fora <br /> zero lot line, it would be considered as part of the building with a fire <br /> separation. The zero lot line is permitted by the UBC. <br /> Drainage of this property will drain into one retention basin on the east side of <br /> the lot and one on the west side of the lot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.