Laserfiche WebLink
1 CITY OF ST. ANTHONY <br /> 2 <br /> CITY COUNCIL SPECIAL COUNCIL MEETING MINUTES <br /> 0 NOVEMBER 29, 1994 <br /> 5 <br /> 6 <br /> 7 I. CALL TO ORDER/ROLL CALL. <br /> 8 The meeting was called.to order at,6:30 P.M. by Mayor Ranallo. <br /> 9 <br /> 10 II. ROLL CALL. <br /> 11 Councilmembers Present: Ranallo, Marks, Enrooth, Wagner, and Fleming. <br /> 12 Also Present: Michael Mornson, City Manager; City Attorney, William Soth; and Public <br /> 13 Works Director, Larry Hamer. <br /> 14 <br /> 15 III. DISCUSSION OF AN ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW). <br /> 16 Mayor Ranallo reported that the purpose of this special City Council meeting was to <br /> 17 decide if it is necessary to complete the Environmental Assessment Worksheet. He <br /> 18 stated that the City Attorney had been working on the issue since the last meeting of <br /> 19 November 22, 1994. He reported that residents on Silver Lake have proposed eleven <br /> 20 items which they would like resolved. He stated that there was a meeting held yesterday <br /> 21 between Dennis Cavanaugh, C. G. Rein, and the representatives of Silver Lake <br /> 22 Homeowners Association. Cavanaugh has agreed to a number of items on the list but <br /> 23 not all items were agreed upon. The city has been asking the Home Owners Association <br /> 24 to withdraw their petition. The next step in the process would be to go to the Rice <br /> Creek Watershed District and ask for a ruling giving CUB Foods and Knox Lumber <br /> OF6 permits to start construction. <br /> 27 <br /> 28 Dennis Cavanaugh, C. G. Rein Co., thanked the City Council for having this special <br /> 29 meeting. He then introduced Bob Beduhn, Barr Engineering, to present the proposed <br /> 30 drainage plan that has been presented to the neighbors. <br /> 31 <br /> 32 Bob Beduhn, Barr Engineering, presented a sketch of the original proposition of the <br /> 33 drainage plan for Apache Plaza. The original proposal was for a three pond system. <br /> 34 The first pond would treat the storm water in the area of the proposed CUB Foods <br /> 35 parking lot. The second.pond would treat the storm water by New Market and the <br /> 36 employee parking lot and CUB Foods loading dock area. The third pond would treat <br /> 37 the run-off of Knox and Herbergers. In addition to the proposed ponds, there was a <br /> 38 supervised maintenance agreement. This agreement included sweeping of the parking <br /> 39 lot, maintenance of the ponds and daily inspection of the parking lot. The City of St. <br /> 40 Anthony will oversee the maintenance efforts. The proposal has since been tabled and <br /> 41 Barr Engineering was told to redevelop the plans to something that would be agreeable <br /> 42 with the residents on Silver Lake and the Rice Creek Watershed District. <br /> 43 <br /> 44 Beduhn presented the alternative proposal for the drainage plan at Apache Plaza. The <br /> 45 main focus of the new plan was that 100% of the parking lot area of Apache Plaza would <br /> 46 receive some form of water quality treatment. The proposed pond by CUB Foods and <br /> also by New Market would stay the same in this plan. The third proposed pond would <br /> 48 be increased in size and incorporate the same area. In addition to increasing the third <br />