(8) 100 year flood plans, flood fringes and flood ways. <br /> (b) Site construction plan. A site construction plan, including: <br /> (1) Locations and dimensions of all proposed land disturbing activities and <br /> any phasing of those activities: <br /> (2) Locations and dimensions of all temporary soil or dirt stockpiles. <br /> (3) Locations and dimensions of all constructions site erosion control <br /> measures necessary to meet the requirements of this ordinanee Section. <br /> (4) Schedule of anticipated starting and completion date of each land <br /> disturbing activity including the installation of construction site erosion <br /> control measures needed to meet the requirements of this ordinance <br /> Section. <br /> (5) Provisions for maintenance of the construction site erosion control <br /> measures during construction. <br /> lcl Drawing of final site conditions. A plan drawing of final site conditions <br /> on the same scale as the existing site map showing the site changes <br /> including: <br /> (1) Finished grading shown at contours at the same interval as provided above <br /> or as required to clearly indicate the relationship of proposed changes to <br /> existing topography and remaining features. <br /> (2) A landscape plan,drawn to an appropriate scale,including dimensions and <br /> distances and the location,type, size and description of all proposed <br /> landscape materials which will be added to the site as part of the <br /> development. <br /> (3) A drainage plan of the developed site delineating in which direction and at <br /> what rate storm water will be conveyed from the site and setting forth the <br /> areas of-the site where storm water will be allowed to collect. <br /> (4) The proposed size,alignment and intended use of any structures to be <br /> erected on the site. <br /> .(5) A clear delineation and tabulation of all areas which shall be paved or <br /> surfaced, including a description of the surfacing material to be used. <br /> -7- <br />