My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11171998
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1998
>
PL PACKET 11171998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:37:06 PM
Creation date
12/30/2015 5:36:57 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1998
SP Name
PL PACKET 11171998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z� <br /> conTliance with conditions wiflin a specific time,which time may be extended in <br /> situ Section 1675.0?, Str and to comply with any required conditions <br /> The agreement must be accompanied by cash or a letter of credit in form and <br /> amount determined by the Council sufficient to secure performance of the <br /> applicant's obligations. <br /> Subd. 5. Fees. All applications for storm water managen=zt plan approval shall be <br /> accompanied by a processing and approval fee of$150.00. <br /> 1675.08 Approval Standards. <br /> Subd. 1. No stonn wateL management p1mi whigh&iIs to meet tile Requirements The <br /> standards contained in this Section shaIt ve approved must be met to the degree <br /> Muired by the City Council. <br /> Subd. 2. Site dewatering. Water pumped from the site shall be treated by temporary <br /> sedimentation basins, grit chambers, sand filters,upflow chambers,hydro-calcines, swirl <br /> concentrators or other appropriate controls as appropriate. Water may not be discharged <br /> in a.manner that.causes corrosion or flooding of the site or receiving channels or a <br /> wetland. <br /> Subd. 3. Waste and material disuosal. All waste and unused building materials <br /> (including garbage, debris,cleaning wastes,wastewater,toxic materials or hazardous <br /> materials)shall be properly disposed of off-site and not allowed to be carried by runoff <br /> into a receiving channel or storm sewer system. <br /> Subd. 4. Tracking. Each site shall have graveled roads, access drives and parking areas <br /> of sufficient width and length to prevent sediment from being tracked onto public or <br /> private roadways. Any sediment reaching a public or private road shall be removed by <br /> street cleaning(not flushing)before the end of each workday. <br /> Subd. 5. Drain inlet protection. All storm drain inlets shall be protected during <br /> construction until control measures are in place with a straw bale, silt fence or equivalent <br /> barrier meeting accepted design criteria, standards and specifications contained in the <br /> MPCA publication."Protecting Water Quality in Urban Areas". <br /> Subd. 6. Site erosion control. The requirements of this <br /> subdivision apply only to construction activities that result in runoff leaving the site. <br /> (a) Channelized runoff from adjacent areas passing through the site shall be diverted <br /> around disturbed areas, if practical. Otherwise,the channel shall be protected as <br /> described below. Sheetflow runoff from adjacent areas greater than 10,000 square <br /> feet in area shall also be diverted around disturbed areas,unless shown to have . <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.