My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11171998
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1998
>
PL PACKET 11171998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:37:06 PM
Creation date
12/30/2015 5:36:57 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1998
SP Name
PL PACKET 11171998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) An applicant shall install or construct, on or for the proposed land disturbing or <br /> development activity,all storm water management facilities necessary to manage <br /> increased runoff so that the two year,ten 12 year, and 100 year storm peak <br /> discharge rates existing before the proposed development shall not be increased <br /> and.accelerated channel erosion will not occur as a result of the proposed land <br /> disturbing or development activity. An applicant may also make an in-kind or <br /> monetary contribution to the development and maintenance of community storm <br /> water management facilities designed to serve multiple land disturbing and <br /> development activities undertaken by one or more persons, including the <br /> applicant. <br /> (b) The applicant shall give consideration to reducing the need for storm water <br /> management facilities by incorporating the use of natural topography and land <br /> cover such as wetlands,ponds,natural swales and depressions as they exist before <br /> development to the degree that they can accommodate the additional flow of water <br /> without compromising the integrity or quality of the wetland or pond, <br /> (c) The following storm water management practices shall be investigated in <br /> developing a stonn wateL managernent plan in the following descending order of <br /> preference: <br /> (1) Natural infiltration of precipitation on-site; <br /> (2) Flow attenuation by use of open vegetated swales and natural depressing; <br /> (3) Storm water retention facilities; and <br /> (4) Storm water detention facilities. <br /> (d) A combination of successive practices may be used to achieve the applicable <br /> minimum control requirements specified in subsection a)above a of this <br /> subdivision. Justification shall be provided by the applicant for the method <br /> selected. <br /> Subd. 8. Design standards. Storm water detention facilities constructed in the City of <br /> 2knthoriy shall be designed according to the most current technology'as reflected in the <br /> MPCA publication"Protecting Water Quality in Urban Areas", and shall contain,at a <br /> minimum,the following design factors: <br /> (a) A permanent pond surface area equal to two Vereeat Vlo of the impervious area <br /> draining to the pond or orrepereent 11/6 of the entire area draining to the pond, <br /> whichever amount is greater; <br /> -11-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.