My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02192002
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2002
>
PL PACKET 02192002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:40:57 PM
Creation date
12/30/2015 7:40:49 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 02192002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Anthony Village <br /> Northwest Quadrant Redevelopment <br /> Open House Comments Summary <br /> Street Design/Transit <br /> Road network <br /> - Liked the curving streets with green space <br /> - Liked the proposed 39h Avenue thoroughfare between Silver Lake Rd and <br /> Stinson (2) <br /> - Incorporate the two thru streets no matter who is the developer <br /> - Good ingress/egress on plans (2) <br /> - Use a grid street layout <br /> - Concerned that extra traffic on Silver Lake Road will be funneling into <br /> neighborhood streets if the road is widened. <br /> - Concerned about impact on traffic (6) <br /> - Add more stop lights <br /> Transit <br /> - Forward thinking about rail transit issue <br /> - Like the park and ride transit point (2) <br /> - Good transit opportunities <br /> Parking <br /> It was not clear in the design concepts where the retail parking would be <br /> located. (2) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.