Laserfiche WebLink
E <br /> LEGEND ; / /� / L OLE \ Cluts <br /> S 0 20 40 80�`T / \ BPS �,Fp�E S O'Brien <br /> + PROPOSED DECIDUOUS TREE <br /> / �� GAS Strother <br /> / GAS GAS ARCHITECTS <br /> / GAS » � <br /> PROPOSED DECIDUOUS ORNAMENTAL TREE / PROPOSED / /vPS <br /> 0 MONUMENT <br /> Q I,0mcamytUm <br /> / SIGN / -;;�`' / ' "or a. o <br /> PROPOSED EVERGREEN TREE �" "°dW `° = <br /> It <br /> ZZPR❑POSED <br /> ® PROPOSED EVERGREEN SHRUB / CURB CUT < \ TORY gRIOK <br /> \o I 3 S No. 258 417 O PROPOSED DECIDUOUS SHRUB / \ . � .r= <br /> PROPOSED PERENNIALS/ANNUALS <br /> OW Olk <br /> ° GAS <br /> / \ \ GA S <br /> LANDSCAPE REQUIREMENTS + DROP pFf c, GAS <br /> PROPOSED BUILDING = 38 UNITS / �� GAS <br /> 15 TREES REQUIRED .PER MINIMUM TREE PLANTING REQUIREMENTS + o\ G AN®CA <br /> 25+ UNITS = 12 TREES REQUIR o <br /> 1 TREE PER 5 UNITS OVER 25 UNITS = 3 TREES <br /> TOTAL = 15 TREES MIN UM / 0 11 NEW 'SPACES iq <br /> (NET ADD 7) <br /> MINIMUM TREE SIZE = 1.75 INCHES MEASURED 12 INCH FROM GROUND <br /> / J <br /> + \ <br /> NOTE: / ® N <br /> .\ _ DRAIN CA <br /> EXISTING TREE AND VEGETATION NOT SHOWN. <br /> FINAL PLAN TO PRESERVE EXISTING TREESXND <br /> VEGETATION TO THE MAXIMUM EXTENT <br /> FEASIBLE. AUTUMN <br /> ALL AREAS OTHER THAN HARD PE OR + \ / + WOODS' <br /> PLANTING BEDS ARE TO BE SODDED. AREAS / <br /> C I <br /> DISTURBED DURING CONSTRICTION ARE TO BE _ / ► . 3;. ' PHASE <br /> RETURNED TO A CONDITION EQUAL TO OR / �� D — <br /> BETTER THAN PRIOR O CONSTRUCTION. 2 <br /> -7 <br /> • � � hh -4' � PRELIMINARY <br /> 25' ETBAC Y LANDPHASE 2PLAN <br /> / I /i P ANC � � oa.ea...n 1021fiL0 <br /> 1 - NL Y 1QIIQMJ� <br /> / LEC BO f�n <br /> EC BOX <br /> L Li <br />