Laserfiche WebLink
Planning Commission Meeting Minutes <br /> September 16, 2003 <br /> Page 3 <br /> 1 Jerry Kellgren, Building Manager, reviewed the proposal with the Commission stating that the <br /> 2 proposed sign conforms to all of the City ordinance requirements except for the 15-foot setback <br /> 3 from the property line. He explained that in order to avoid affecting traffic flow in and out of the <br /> 4 parking lot they would like to place the sign as close as possible to the east edge of the lot. He <br /> 5 stated that no further signage is planned adding that the former drive-up teller has been removed. <br /> 6 He clarified the lighting noting that they anticipate lighting to be from dusk to midnight. He <br /> 7 reviewed the proposed landscaping with the Commission noting that it would remain basically <br /> 8 unchanged except for the addition of small shrubs around the base of the sign. <br /> 9 <br /> 10 Commissioner Hanson asked if any consideration has been given to moving the garbage <br /> 11 dumpster. Mr. Kellgren stated that they considered other locations for the dumpster and <br /> 12 explained that because there is no truck access to the back of the building the dumpster has to <br /> 13 remain in the currently proposed location. <br /> 14 <br /> 15 Commissioner Tillman referenced the shrubs around the basin and asked if there would be a <br /> 16 border or step up from the asphalt. Mr. Kellgren clarified that it would step up from the asphalt <br /> 17 and that edging would be included around the base. <br /> 18 <br /> 19 Chair Melsha asked if they would have the landscaping plan available by spring. Mr. Kellgren <br /> 20 stated that the landscaping plan would be ready for review by Spring 2004. <br /> 21 <br /> 22 Vice Chair Stille asked Ms. Hall if a deposit would be required. Ms. Hall stated that a deposit is <br /> 23 an option adding that a building permit is required before anything can begin. She reviewed the <br /> 24 permit process with the Commission. <br /> 25 <br /> 26 Chair Melsha closed the public hearing at 7:14 p.m. <br /> 27 <br /> 28 Commissioner Tillman asked if issuance of the permit could be made contingent upon presenting <br /> 29 a landscaping plan for final review. Chair Melsha agreed and asked how it would be addressed. <br /> 30 Ms. Hall stated that the applicant would be required to present the landscaping plan at the time <br /> 31 they apply for the permit. She assured the Commission that the City has not had very many <br /> 32 problems with this kind of application. <br /> 33 <br /> 34 Motion by Commissioner Tillman, second by Commissioner Stromgren, to recommend approval <br /> 35 of the 3-foot variance request of the Northgate sign due to the triangular shape of the lot; that it <br /> 36 does not alter the character of the area and that a landscaping plan is submitted for review and <br /> 37 completed in Spring 2004. <br /> 38 <br /> 39 Motion carried unanimously. <br /> 40 _ <br /> 41 8.2 St Anthony Shopping Center LLC 2900 Pentagon Drive, Amend Comprehensive Sign <br /> 42 Plan. <br /> 43 <br /> 44 Chair Melsha opened the Public Hearing at 7:18 p.m. <br /> 45 <br />