My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06051990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 06051990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:06:01 PM
Creation date
12/30/2015 8:05:46 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 06051990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> STORM SEWER FEASIBILITY STUDY <br /> WILSON STREET AND 29TH AVENUE AREA <br /> PROJECT NO. 90-023 <br /> I . OBTAIN INFORMATION <br /> A. Contact the City of Minneapolis to discuss connection to their <br /> system. <br /> 1 . calculate approximate flow rates and pumping rates for the <br /> proposed diversion . <br /> 2 . review possible connection points and piping corridor to <br /> determine approximate areas of pavement , curbing , turf , etc . <br /> that may be disturbed. <br /> B . OBTAIN RECORD PLANS <br /> 1 . From Saint Anthony Village <br /> a . sanitary sewer on 29th Avenue . <br /> b. sanitary sewer on Wilson Street . <br /> • c . watermain on 29th Avenue . <br /> d. watermain on Wilson Street . <br /> e . storm sewer on 29th Avenue . <br /> f . storm sewer on Wilson Street <br /> g . street for 29th Avenue . <br /> h. street for Wilson Street . <br /> i . other pertinent data on the storm sewer system. <br /> 2 . From City of Minneapolis <br /> a . sanitary sewer on 29th Avenue . <br /> b . watermain on 29th Avenue . <br /> c . storm sewer on 29th Avenue . <br /> d. street for 29th Avenue. <br /> 3 . From Hennepin County <br /> a . half-section maps . <br /> b. aerial photo maps . <br /> C. FIELD SURVEY <br /> 1 . determine alternate corridors available for piping . <br /> a . location within boulevard as much as possible. <br /> b. location relative to existing utilities . <br /> c . location relative to existing landscaping. <br /> d. location relative to existing curbing and pavement . <br /> 2 . perform field survey of the alternate corridor areas . <br />
The URL can be used to link to this page
Your browser does not support the video tag.