My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08141990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 08141990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:07:50 PM
Creation date
12/30/2015 8:07:39 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08141990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> October 6, 1989 <br /> Mr. Larry Hamer <br /> Director of Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Proposal for Engineering Services <br /> Well House No. 3 <br /> RCM Project No. 14027.00 <br /> Dear Mr. Hamer: <br /> This letter is in response to your recent request for a proposal on replacement <br /> of the controls and electrical service to Well No. 3 and evaluation of the <br /> rieke electrical service to the water treatment facilities. <br /> carroll <br /> muller We understand that the immediate major problem is the overheating and <br /> associates, inc. tripping out of the Well No. 3 starter. Investigation will include verification of <br /> Aftmeers the well pump horsepower requirement, probable replacement of the existing <br /> itects motor and starter controls stem and evaluation of current voltage capacity. <br /> and surveyors The overall evaluation of the electrical service will include study and <br /> equal opportunity recommendation on the electrical distribution system for the entire water <br /> employer treatment complex currently distributed from Well House No. 3. We will <br /> evaluate the installation of an auxiliary generator receptacle and installation <br /> of a manual transfer switch. <br /> Depending on the final selected recommendation, we will prepare plans and <br /> specifications, assist during the bidding process and provide construction <br /> administration services including shop drawing review during the construction <br /> phase of the project. We propose to perform the above services for a fee based <br /> on salary cost times a factor of 2.5 for service rendered by our principals and <br /> employees engaged directly on the project with a not to exceed maximum of <br /> $3,600.00 without further authorization from the Council. <br /> Scope of services includes evaluation and probable replacement of the following <br /> components: <br /> 1. Evaluate existing well pump and determine proper drive capacity. <br /> 2. Installation of new motor. <br /> 3. Installation of new starter. <br /> 4. Modification of well house ventilation. <br /> 5. Modification of existing well pump control system. <br /> 6. Rewiring of Well House No. 3. <br /> 7. Consolidation and replacement of present distribution panel. <br /> • 8. Installation of auxiliary generator receptacle and manual transfer <br /> switch. <br /> 10901 red circle drive <br /> box 130 <br /> minnetonka. minnesota 55343 <br /> 612-935-6901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.