My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08141990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 08141990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:07:50 PM
Creation date
12/30/2015 8:07:39 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08141990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
alkw <br /> • February 15, 1990 <br /> Mr. Larry Hamer <br /> Director of Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Modification to Well House No. 3 <br /> RCM Project No. 14027.01 <br /> Dear Mr. Hamer: <br /> Two sets of plans and specifications have been forwarded to Neils Fellow for <br /> MPCA review and approval. The Department of Health does not require <br /> approval for this project. Once we receive MPCA comment, we will <br /> incorporate them and issue the documents for bidding. <br /> The initial estimate has been revised to reflect the actual work shown on the <br /> drawings and specifications. <br /> rieke 1. General Submittals, Administration <br /> -nrroll and Mobilization $1,000 <br /> ates,Inc. 2. Exhaust Fan & Louver 2,000 <br /> meers <br /> la isury 3, 150 HP Motor In Place 11,900 <br /> lava surveyors <br /> equal opportunity 4. Demolition, Temporary Wiring, <br /> employer Cutover and Removals 2,220 <br /> 5. Motor Control Center <br /> a. Lighting arrestor, surge caps 600 <br /> b. NSP metering cubicle- • 1,800 <br /> c. 800A main fuse switch 4,300 <br /> d. 400A main fuse switch 2,500 <br /> e. Phase fail relay, wiring 450 <br /> f. 200A fuse switch-Booster Station 1,400 <br /> g. 400A fuse switch-Filter Plant 2,500 <br /> h. Well *3 Starter (Reduce Voltage) 15,600 <br /> i. Pf correction capacitor 2,100 <br /> j. Pf capacitor contactor 900 <br /> k. Unit heater contactor 900 <br /> 1. LP XFMR fuse switch 600 <br /> m. Control relays, timers, switches, <br /> running time meter, wiring 650 <br /> Subtotal MCC 34,300 <br /> 6. 15 KVA LP Transfer & Wiring 750 <br /> 7. Lighting Panel, Breakers & Feeder 950 <br /> 8. Generator Receptacle & Feeder 2,400 <br /> 10901 red circle drive <br /> box 130 <br /> minnetonka.minnesota 55343 <br /> 612-935-6901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.