Laserfiche WebLink
CSB <br /> �f <br /> July 18, 1990 <br /> Mr. Larry Hamer <br /> Director of Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Modification of Well House No. 3 <br /> RCM Project No. 14027.01 <br /> Dear Mr. Hamer: <br /> On February 15, plans and specifications were forwarded to MPCA and a <br /> revised estimate was sent to your attention with a total project estimate of <br /> $70,900. Based upon this estimate and a personal meeting with Mr. Fellows, <br /> the MPCA increased their funding to reflect the additional expenditures. <br /> Included in this estimate was the figure of $6,000 for engineering fees and <br /> $500 printing costs for the plans and specifications. <br /> deke Unfortunately, this increase in the original estimated fee of $3,600 was not <br /> moll brought to the City's attention. In the process of expediting the completion of <br /> muller the plans and specifications, we continued on the project until the documents <br /> ffates,inc. were completed and submitted to the State. The February and March invoices <br /> i7ecceers ts reflect this work effort. Only a small portion of our electrical consultants <br /> land surveyors time, 21 hours to be exact, was included. The March invoice (No. 2095) <br /> exceeds the original fee of $3,600 so only that portion, plus reimbursable <br /> equal opportunity travel expenditures were requested. The remainder was to be picked up if the <br /> employer MPCA increased the grant. <br /> The grant funds were increased and the two June invoices (Nos. 2300 and <br /> 2301) reflect this increase and cover the extent of service up through that <br /> time. In order to help clarify this overlapping time frame, we invoiced back <br /> to the end of January and then credited you with the payment of the March <br /> invoice of $626.86. This invoice also includes the fee of our electrical <br /> consultant and reflects approximately 70 hours of electrical engineering and <br /> drafting service. These invoices represent the complete preparation of the <br /> plans and specifications. Invoice No. 2301 covers a portion of the extra <br /> services provided by RCM in obtaining the grant amendment. Our combined <br /> efforts were successful and the additional funds were released. <br /> Bids have been received and the construction contracts are in the process of <br /> being executed. It is anticipated that work will proceed on the site after <br /> September 15. <br /> The enclosed invoice, No. 2351, represents a portion of our services during the <br /> bidding period and reimbursable printing cost for the specifications. We need <br /> to sit down, possibly with the Council, to come up with an authorization <br /> to exceed the initial $3,600.00 plus reimbursables. Additional expenditures <br /> • will be required for a preconstruction meeting, shop drawing review, and <br /> final inspection. <br /> 10901 red circle drive <br /> box 130 <br /> minnetonka, minnesota 55343 <br /> 612-935-6901 <br />