My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12101991
StAnthony
>
City Council
>
City Council Packets
>
1991
>
CC PACKET 12101991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:14:13 PM
Creation date
12/30/2015 8:14:05 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 12101991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 :7 E T AB C(DUN I L :'.=__ I ICC <br /> ^fit 26 199 <br /> T J <br /> r'AC; <br /> 4 <br /> 5 <br /> 6 Intertech Pavement , Inc . for pavement management and <br /> 7 program installation . <br /> 3 <br /> 9 lotion carried unanir_o.isi__ <br /> i0 <br /> it B . Verified Clal: l,,s <br /> 12 <br /> 13 ` 2'ioticn by 'arks , second by Yleming to .:'prove <br /> 14 pay. ,ent of the six rages of verified claims as <br /> 15 submitt-ed by the Finance Director . <br /> 16 <br /> 17 Notion carried unanimously <br /> 18 <br /> 19 <br /> 20 Award Bid for Highcrest Storm Sewer Outlet <br /> 21 <br /> 22 Dana Gauthier , an engineer representing Barr Engineering, <br /> 23 advised the Council that there were eight bids received <br /> 24 for this project . The bid opening was on November 25 , <br /> 25 1991 . Copies of the bids received were distributed to the <br /> 6 Councilmembers . <br /> 407 <br /> 23 Gauthier stated that this is a labor intensive project <br /> 29 and felt this was reflected in the bid spread which <br /> 30 ranged from $43 , 040 . 00 to $31 , 950 . 00 . <br /> 31 <br /> 32 Barr Engineering had reviewed the bids and recommended <br /> 33 the bid be awarded to the low, reponsible bidder, F. F. <br /> 34 Jedlecki Company . Gauthier advised that the proposal <br /> 35 submitted by this f i rm had been reviewed and found to be <br /> 36 in proper order . He also stated that on,a of its <br /> 37 references had been contacted and a satisfactory <br /> 38 statement was made by that reference . <br /> 39 <br /> 40 The City ;`ia7aCe�_ noted that, t11S ?irOje-'- i:aQ i=��+ - <br /> 41 He felt t.ie Lrol-Do al of the lo'.. bidder was <br /> with what the Counci 1 an3 s taf ;1a'3 c l.,S: .:Sr�l7 <br /> 43 appropriate costs for t',-,.e pro.je'_t . <br /> z� tt _ <br /> 45 i'lotloll b;+ 1':a.�. s , Fg l'•I�i:�1 �•• ' <br /> }1-' gar]:�I <br /> 46 the Hicncrest Szoria r'�41r t_:ut }ct .i1.0 G-C:t _'J tE':', <br /> Jedlecki cc..,--pd11y 1:, t:le airiouni. Vi •r`t x , '.,40 03 <br /> . n <br /> 40 <br /> Y ] ,•.'J� •"' ::_ _ a ?' iii:ri ill _. <br /> U, <br /> �0 <br /> i 1 I�BL' <br /> A. 1992 Levy <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.