Laserfiche WebLink
• STAFF*REPORT <br /> DATE: April 22, 1992 <br /> TO: Thomas D. Burt, City Manager <br /> FROM: Larry Hamer, Public Works Director <br /> ITEM: OLD HIGHWAY 8 RECONSTRUCTION BIDS <br /> Six bids were received for the reconstruction of Old Highway 8. The low <br /> bid of $254,489.35 was from F. M. Frattalone Excavating. The engineers <br /> had estimated the cost to be $286,839.50. <br /> RECOMMENDATION <br /> Recommend approval of the low bid from F. M. Frattalone Excavating for <br /> the reconstruction of Old Highway 8. <br />