My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10121993
StAnthony
>
City Council
>
City Council Packets
>
1993
>
CC PACKET 10121993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:25:53 PM
Creation date
12/30/2015 8:25:43 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 10121993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 REGULAR COUNCIL MEETING • <br /> 2 SEPTEMBER 28 , 1993 <br /> 3 PAGE 4 <br /> 4 <br /> 5 <br /> 6 Mr. Hawkins noted that there is a one year warranty against <br /> 7 settlement for the compaction work done by the contractor. <br /> 8 <br /> 9 Mary Ann McNeil , 3500 31st Avenue, had serious concerns with <br /> 10 the manner in which her steps were replaced and her electric <br /> 11 light was torn up. Mr . Hawkins assured her the contractor will <br /> 12 re-do this job until she is satisfied. <br /> 13 <br /> 14 Councilmember Fleming felt the essence of property owners <br /> 15 concern was they should not have to oversee any of this <br /> 16 project to guarantee the work is done correctly. <br /> 17 <br /> 18 Bob Stroncek, 3416 31st Avenue, inquired what is reasonable to <br /> 19 expect from the sod which has been replaced in this project . <br /> 20 Mrs . Stroncek noted there are three shades of green in their <br /> 21 yard after this project was done. Other property owners <br /> 22 advised that some of their sod doesn ' t look very healthy at <br /> 23 this point in time and is very mushy. <br /> 24 <br /> 25 Virgil Hawkins responded that the ground is very moist . He <br /> 26 noted it will eventually dry out and a water truck will be • <br /> 27 coming regularly to keep the sod moist . There is usually a <br /> 28 thirty day watering period and there is a warranty which goes <br /> 29 until October 25, 1993 . <br /> 30 <br /> 31 The condition of the sod will be evaluated in thirty days . If <br /> 32 the condition of the sod is not acceptable the warranty will <br /> 33 be extended until , the next growing period. If there is any <br /> 34 frost kill or winter kill this will be taken care. of by the <br /> 35 contractor . <br /> 36 <br /> 37 Jim Higgins , 3409 31st Avenue, inquired what measures will be <br /> 38 taken regarding his stop box . The stop box had been run over <br /> 39 and is no longer visible. Mr. Hawkins responded this is the <br /> 40 contractor ' s responsibility to bring the stop box to grade and <br /> 41 this item is on the "punch list" for the contractor. <br /> 42 <br /> 43 Discussion continued regarding some of the changes made to the <br /> _ 44 project after it had begun . It was felt by residents that the <br /> 45 changes happened only because they insisted on them. Mr. <br /> 46 Hawkins acknowledged that there was a six inch change in <br /> 47 response to residents ' concerns . <br /> 48 <br /> 49 Councilmember Wagner recalled his experience with the <br /> 50 reconstruction of a portion of 37th Avenue. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.