PARTIAL PAY ESTIMATE <br /> #1 <br /> FROM: SEPTEMBER 28, 1993 <br /> TO: OCTOBER 1, 1993 (COF)Y <br /> CONTRACTOR: PROGRESSIVE CONTRACTORS,INC. <br /> • ADDRESS: 8736 ZACHARY LANE,OSSEO,MN 55369 <br /> OWNER: CITY OF ST.ANTHONY,MINNESOTA <br /> PROJECT: 37TH AVENUE CONCRETE STREET REHABILITATION <br /> COMPLETION DATE AMOUNT OF CONTRACT <br /> ORIGINAL: November 13, 1993 ORIGINAL: $ 241,179.50 <br /> REVISED: REVISED: 5 <br /> CONTRACT ITEMS THIS PERI00 TOTAL TO DATE,: <br /> ITEM ITEM DESCRIPTION <br /> NO NIT, QTY . .. .. UNIT'..: 4TY UNIT :; QTY­'::':'.:_"-:::::: UNIT <br /> . :.PRICE'.:':. PRICE : . PRICE . <br /> SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS <br /> 1 MOBILIZATION LS 1 $28,700.00 0.5 $13,350.00 0.5 $13,350.00 <br /> 2 REMOVE CONC. CURB &GUTTER LF 20 $7.00 19 $133.00 19 $133.00 <br /> 3 B8 CONCRETE CURB LF 20 $15.00 19 $285.00 19 $285.00 <br /> 4 CL. 5 AGG. ( 100% CRSHD LIMESTNE) TON 500 $10.00 0 $0.00 0 $0.00 <br /> 5 CONCRETE PAVEMENT PLANING SY 10500 $3.75 0 $0.00 O $0.00 <br /> 6 SEAL CONCRETE PAVEMENT(3723) LB. 1250 $3.00 0 $0.00 0 $0.00 <br /> 7 SEAL CONCRETE PAVMNT(SILICONE) I.B. 900 $7.50 0 $0.00 0 $0.00 <br /> 8 1/2"JOINT REPAIR(TYPE A-1 MOD) LF 6000 $1.00 0 $0.00 0 $0.00 <br /> 9 1/2" LONGITDNL.JNT. TRP. (TYPE A-5) LF 11500 $0.60 0 $0.00 0 $0.00 <br /> 10 CRACK REPAIR(TYPE A-3) LF 250 $1.50 0 $0.00 0 $0.00 <br /> 11 SPOT SURFACE REPAIR(TYPE B-2A) SF 540 $15.00 172 $2,580.00 172 $2,580.00 <br /> 12 SURFACE REPAIR(TYPE B-213) (>30SF) SF 180 $10.00 8.4 $64.00 8.4 $84.00 <br /> 13 SPOT FULL DEPTH REPAIR(TYPE C-1) SF 855 $23.00 230 $5,290.00 230 $5,290.00 <br /> 14 CONCRETE PAVEMENT(TYPE D) SY 1700 $35.00 732 $25,620.00 732 $25,820.00 <br /> 15 NO. 8 REINFORCEMENT BARS I.B. 8800 $1.50 1480 $2,220.00 1480 $2,220.00 <br /> 16 F&I NEEHNAH R-3250-1 CASTING ASSMBL EA 1 $400.00 1 $400.00 1 $400.00 <br /> 17 TRAFFIC CONTROL LS 1 $10,000.00 0.5 $5,000.00 0.5 $5,000.00 <br /> 60" <br /> ADJUST M.H. CASTING EA 17 $150.00 8 $1,200.00 8 $1,200.00 <br /> ADJUST C.B. CASTING EA 7 $175.00 2 $350.00 2 $350.00 PAVEMENT MARKINGS LS 1 $1,100.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS-Total $56,492.00 $58,492.00 <br /> SCHEDULE 2.0 SIDEWALK CONSTRUCTION <br /> 1 REMOVE CONC. CURB&GUTTER LF 28 $6.00 0 $0.00 0 $0.00 <br /> 2 CL. 5 AGG. (100% CRSHD LIMESTONE) TON 240 $12.00 0 $0.00 0 $0.00 <br /> 3 4" THICK CONCRETE SIDEWALK SF 10990 $1.80 0 $0.00 0 $0.00 <br /> 4 8" THICK CONCRETE SIDEWALK SF 1000 $2.15 0 $0.00 0 $0.00 <br /> 5 PEDESTRIAN RAMP EA 2 $300.00 0 $0.00 0 $0.00 <br /> 8 REMOVE ASPHALT PAVEMENT SY 75 $6.00 0 $0.00 0 $0.00 <br /> 7 REMOVE CONCRETE PAVEMENT SY 85 $12.00 0 $0.00 0 $0.00 <br /> 8 2" BIT. DRIVEWAY RESTORATION SY 75 $12.00 0 $0.00 0 $0.00 <br /> 9 CLEARING&GRUBBING TREES LS 1 $1,500.00 0 $0.00 0 $0.00 <br /> 10 ADJUST M.H. CASTING EA 7 $180.00 0 $0.00 0 $0.00 <br /> 11 SELECT TOPSOIL BORROW CY 160 $10.00 0 $0.00 0 $0.00 <br /> 12 SOD, LAWN& BOULEVARD TYPE SY 2850 $1.95 0 $0.00 0 $0.00 <br /> 13 BB CONCRETE CURB LF 28 $15.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 2.0 SIDEWALK CONSTRUCTION-Total $0.00 $0.00 <br /> TOTAL THIS PERIOD $56,492.00 <br /> TOTAL TO DATE <br /> $56.492.00 <br /> • <br /> 490015.No1 <br />