Laserfiche WebLink
CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br /> ITEM ITEM DESCRIPTION <br /> ' NO: _. ;; :. ;. NIT.:,': QTY. UNIT, QTY. UNIT QTY. UNIT <br /> . PRICE PRICE PRICE <br /> SCHEDULE 7.0 WATERMAIN IMPROVEMENTS <br /> 1 ABANDON & PLUG EXIST. WATERMAIN LS 1 $3,500.00 0 $0.00 1 $3,500.00 <br /> 2 REMOVE EXISTING WATERMAIN (8' & 101 LF 470 $7.00 0 $0.00 470 $3,290.00 <br /> 3 REMOVE EXISTING HYDRANT EA 8 $130.00 0 $0.00 8 $780.00 <br /> 4 8"DIA. DUCTILE IRON PIPE LF 2084 $17.00 0 $0.00 2084 05,428.00 <br /> 5 10' DIA. DUCTILE IRON PIPE LF 397 $28.00 0 $0.00 397 $10,322.00 <br /> 8 8"VALVE EA 8 $400.00 0 $0.00 8 $2,400.00 <br /> 7 10'VALVE EA 3 $700.00 1 $700.00 2 $1,400.00 <br /> 8 CONNECT TO EXIST. WATERMAIN EA 8 $1,700.00 0 $0.00 8 $13,800.J0 <br /> 9 HYDRANT W/VALVE EA 8 $1,800.00 0 $0.00 8 $9,80L'.00 <br /> 10 FITINGS LBS 3000 $1.80 0 $0.00 3000 $5,400.00 <br /> 11 1' SERVICE CONNECTION TO NEW MAIN EA 44 $200.00 0 $0.00 44 $8,800.00 <br /> 12 1' SERVICE PIPE LF 1380 $8.00 0 $0.00 1380 $10,880.00 <br /> 13 CONNECT NEW SERIVCE TO EXISTING EA 40 $180.00 0 $0.00 40 $8,400.00 <br /> 14 CONCRETE STREET RESTORATIN LS 1 $4,000.00 0 $0.00 1 $4,000.00 <br /> 15 GRANULAR FOUNDAITON MATERIAL TON 500 $10.00 0 $0.00 480 $4,800.00 <br /> 18 TRENCH DENSITY TESTING LS 1 $800.00 0.0 $0.00 1 $800.00 <br /> T SCHEDULE 7.0 WAERMAIN IMPROVEMENTS- Total $700.00 $121,400.00 <br /> SCHEDULE 8.0 SANITARY SEWER <br /> 1 REMOVE EXIST. SANITARY SEWER LF 505 $5.00 0 $0.00 505 $2,525.00 <br /> 2 REMOVE EXIST. SANITARY M.H. EA 1 $220.00 0 $0.00 1 $220.00 <br /> 3 8' SANITARY PVC (0-8' DEPTH) LF 317 $13.00 0 $0.00 319 $4,147.00 <br /> 4 8" SANITARY PVC (8- 10' DEPTH) LF 200 $15.00 0 $0.00 200 $3,000.00 <br /> 5 3" THICK INSULATION SF 1000 $1.50 0 $0.00 1000 51,500.00 <br /> 8 STD 48' DIA. SANITARY MANHOLE EA 2 $1,200.00 0 $0.00 2 $2,400.00 <br /> 7 CONSTRUCT 48' DIA. MANHOLE EA 1 $1,200.00 0 $0.00 1 $1,200.00 <br /> 8 CONNECT TO EXIST. SANITARY SEWER EA 2 $580.00 0 $0.00 2 $1,120.00 <br /> 9 8'X 4" SANITARY WYE EA 8 $80.00 0 $0.00 8 $380.00 <br /> 10 4"SANITARY SERVICE PIPE LF 180 $11.00 0 $0.00 178 $1,958.00 <br /> 11 CONNECT NEW SERVICE TO EXISTING EA 2 $300.00 0 $0.00 2 $800.00 <br /> 12 GRANULAR FOUNDATION MATERIAL TON 200 $10.00 0 $0.00 200 $2,000.00 <br /> 13 TRENCH DENSITY TESTING LS 1 $500.00 0 $0.00 1 $500.00 <br /> T SCHEDULE 8.0 SANITARY SEWER IMPROVEMENT-Total $0.00 $21,530.00 <br /> SCHEDULE 9.0 ADDED WORK (C.O.f l) <br /> 1 LOWER 8" DIA. WATERMAIN LS 1 $2,400.00 0 $0.00 1 $2,400.00 <br /> 2 CUT-IN 8' DIA. GATE VALVE LS 1 $1,850.00 0 $0.00 1 $1,850.00 <br /> 3 REMOVE CONC. APRON (KINZIE TERR.) LS 1 $1,500.00 0 $0.00 1 $1,500.00 <br /> 4 B818 CONC. CURB &GUTTER LF 81 $5.20 0 $0.00 81 $317.20 <br /> 5 TOPSOIL BORROW CY 200 $10.00 0 $0.00 200 $2,000.00 <br /> 8 CONC. D/WAY APRON (SERVICE STATION) SY 12 $22.00 0 $0.00 12 $284.00 <br /> 7 GRANULAR FOUNDATION MATL. TON 70 $10.00 0 $0.00 70 $700.00 <br /> 8 CONC. ISLAND REMOVAL LS 1 $800.00 0 $0.00 1 $800.00 <br /> `^ ~ <br /> T SCHEDULE 9.0 ADDED WORK(C.041)-Total $0.00 $9,831.20 <br /> TOTAL THIS PERIOD $11,972.20 <br /> TOTAL TO DATE $483,194.05 <br /> 490015.No 1 <br />