a <br /> CHANGE ORDER NO.1 <br /> • PROJECT: 1995 Street and Watermain Improvements <br /> OWNER: City of St Anthony <br /> TO: Midwest Asphalt Corporation <br /> You are directed to make the changes noted below in the subject contract.. <br /> OWNER: CITY OF ST.ANTHONY <br /> BY: BY: 6a) ZLO <br /> Larry r,Public Works Director Paul Blum,Project Manager <br /> DATE: DATE: _ 1—.,9-5 <br /> NATURE OF CHANGE: <br /> Furnish and install equipment and materials necessary to construct six (6) new water services to <br /> properties on Armour Terrace. This change is necessary because the new watermain is being <br /> constructed at greater than normal depth, making it impossible to reconnect existing water services. <br /> Itemized quantities are tabulated below. All work is covered under existing bid items. <br /> • Unit <br /> Item Unit Quantity Price Amount <br /> .Remove Existing Copper Service LF 140 $2.65 $371.00 <br /> Remove Concrete Driveway Pavement SY 10 $3.00 $30.00 <br /> Remove Existing Curb Boxes EA 6 $63.65 $381.90 <br /> Topsoil Borrow - 17 $9.00 $153.00 <br /> Curb Stop,Box and ap EA 6 $180.00 $1,080.00 <br /> 1" Copper Service Pipe LF 170 $7.95 $1,351.50 <br /> 6"Thick Conc.Driveway Pavement SY 10 $25.00 $250.00 <br /> Sod Type-Lawn SY 150 $1.40 $210.00 <br /> Total $3,827.40 <br /> Original contract price $659,709.90 <br /> Net decrease resulting from this agreement $0.00 <br /> Net increase resulting from this agreement $3,827.40 <br /> Total contract price including this agreement $663,537.30 <br /> No adjustment of contract time will result from this agreement. <br /> The above changes are approved: <br /> Midwest Asphalt Corporation <br /> . Contractor <br /> BY: l DATE: <br />