My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05271997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 05271997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:33:33 PM
Creation date
12/30/2015 6:33:25 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 05271997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> Date: May 23, 1997 <br /> To: Mike Morrison, City Manager <br /> From: Larry Hamer, Director of Public Works <br /> Re: Silver Point Park <br /> The basketball stand and ball hoops should be replaced at Silver Point Park. The cost of <br /> replacement will be $1741.73. We can reuse the new equipment if the park is re-done in the <br /> future. <br /> It is my intention to do several maintenance corrections; sidewalk replacements, overlay <br /> basketball court, remove spray pool, and install a childerns swing set. The cost of the swing <br /> set will be $1,012.53. It is my intention to install this swing where the spray pool is. This pool <br /> has not been functional for over fifteen years. <br /> I recommend that we make these improvements. All construction costs will be off the existing <br /> budget. (The swing set off the budget and the basketball hoops off the capital equipment fund.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.