BID TABULATION - EMERGENCY VEHICLE PREEMPTION AND TRAFFIC CONTROL SIGNAL SYSTEMS
<br /> PLAN HOLDER'S LIST
<br /> 1. Egan-McKay Electrical Contractors, Inc.
<br /> 2. Killmer Electric
<br /> 3. Ridgedale Electric, Inc.
<br /> BID OPENING_
<br /> Friday, May 16, 1997; 11:00 a.m.
<br /> Engineer's Estimate Ridgedale Electric Egan-McKay Electrical
<br /> No. Description Quanti Unit Unit Price Total Unit Price Total Unit Price Total
<br /> 1 Full T Actuated T Control 1 S.S. $125,000.00 $125,000.00 $116,000.00 $116,000.00 $125,995.00 $125,995.00
<br /> Signal System H
<br /> (Stinson and 39th)
<br /> 2 Revise Signal System A 1 L.S. $5,000.00 $5,000.00 $2,700.00 $2,700.00 $2,575.00 $2,575.00
<br /> (University and 49th)
<br /> 3 Revise Signal System B 1 L.S. $2,000.00 $2,000.00 $1,700.00 $1,700.00 $1,015.00 $1,015.00
<br /> (University and 44th)
<br /> 4 Revise Signal System C .1 L.S. $12,000.00 $12,000.00 $6,200.00 $6,200.00 $9,195.00 $9,195.00
<br /> (University and 401h)
<br /> 5 Revise Signal System D 1 L.S: $12,000.00 $12,000.00 $6,500.00 . $6,500.00 $9,195.00 $9,195.00
<br /> (University and 37th)
<br /> 6 Revise Signal System E 1 L.S. $27,000.00 $27,000.00 $8,500.00 $8,500.00 $11,069.00 $11,069.00
<br /> (Central and 37th)
<br /> 7 Revise Signal System F 1 L.S. $12,000.00 $12,000.00 $6,500.00 $6,500.00 $8.499.00 $8,499.00
<br /> (37th and Johnson) 195.00
<br /> a Revise Signal System G 1 L.S. $12,000.00 $12,000.00 $6,600.00 $6,600.0 $9,195.00 $9,
<br /> (37th and Stinson)
<br /> TOTAL BID $207,000.00 $154,700.00 $176,738.00
<br />
|