My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04271999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 04271999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:07:43 PM
Creation date
12/30/2015 4:07:37 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 04271999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.AdMW 01% 10901 Red Circle Drive,Suite 200,P.O.Box 130,Minnetonka,MN 55343-0130 612.935.6901 612.935.8814 FAX <br /> f W-OF" IC <br /> 1 <br /> architecture engineering environmental transportation <br /> • <br /> April 21, 1999 RE: City of St. Anthony <br /> Maintenance Work at the G.A.C. <br /> Water Filtration Plant <br /> SEH-RCM No. A-000010491.05 <br /> Honorable Mayor and City Council <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Dear Honorable Mayor and City Council: <br /> Bids were received on April 16, 1999 for the above referenced project. The project was divided into <br /> two separate contracts(projects). One for outside excavation and installation of drain tile around the. <br /> G.A.C. water plant and one for inside painting. <br /> Following is a summary of the five (5) bids that were received for the outside drain tile installation: <br /> Jay Brothers Contracting $10,546.00 <br /> Magney Construction $14,650.00 <br /> F.F. Jedlicki, Inc. $16,296.25 <br /> Forest Lake Contracting .$19,080.00 <br /> Contracting Enterprise, Inc. $19,665.00 <br /> The Engineer's estimate as presented in a letter report on December 23, 1998 for the drain tile <br /> installation was $6,540.00. <br /> During preparation of the bidding documents, we met on the site-with Mr. Jay Hartman and <br /> Mr. Robert Paschke and decided to also place drain tile along the south side of the filtration plant . <br /> (north of the G.A.C. plant)and along the east side of the covered walkway between the two buildings <br /> increasing the amount of tile,granular borrow and restoration required which increased the cost from <br /> the December report. <br /> Six bids were received for Contract B,the inside painting work.Following is a summary of the ceiling. <br /> recoating and floor cleaning and recoating: <br /> Protouch Painting $17,500.00 <br /> • Magney Construction $27,900.00 <br /> V.E. Gray Company $32,351.00 <br /> Short Elliott Hendrickson Inc. Offices located throughout the upper Midwest Equal Opportunity Employer <br /> We help you plan,design,and achieve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.