Forest Lake Contracting,Inc. Attachment to Application for Payment No. 5
<br /> 14777 Lake Drive 1998 Watermain,Street and Storm Sewer Improvements
<br /> Forest Lake,Minnesota 55025 St.Anthony, Minnesota
<br /> Payment Period September 6, 1998 to June 30,1999 RCM No. 10408.03
<br /> This Application Completed to Date
<br /> Item Item Description Unit Quantity Unit Price Amount Quantity Value Quantity Value
<br /> 1 Mobilization LS 1 $11,015.20 $11,015.20 0 $0.00 1 $11,015.20
<br /> 2 Remove Conc.Curb&Gutter LF 5400 $1.40 $7,560.00 0 $0.00 5440 $7,616.00
<br /> 3 Remove Existing Storm Sewer Pipe, (18"Dia.or Less) LF 670 $3.75 $2,512.50 0 $0.00 650 $2,437.50
<br /> 4 Remove Concrete Pavement(incl. DW&SW) SY 1250 $3.50 $4,375.00 0 $0.00 1199 $4,196.50
<br /> 5 Remove Bituminous Pavement(incl. DW) SY 8200 $0.85 $6,970.00 0 $0.00 8763.3 $7,448.81
<br /> 6 Remove Existing Curb Box EA 60 $11.00 $660.00 0 $0.00 60 $660.00
<br /> 7 Remove Existing Catchbasin EA 3 $200.00 $600.00 0 $0.00 2 $400.00
<br /> 8 Remove Existing Manhole EA 2 $200.00 $400.00 0 $0.00 1 $200.00
<br /> 9 Sawing Concrete Pavement&Sidewalk LF 730 $3.50 $2,555.00 0 $0.00 463 $1,620.50
<br /> 10 Sawing Bituminous Pavement LF 750 $2.25 $1,687.50 0 $0.00 795 $1,788.75
<br /> 11 Salvage Existing Hydrant EA 4 $200.00 $800.00 0 $0.00 4 $800.00
<br /> 12 Salvage Existing Copper Service LF 2000 $1.65 $3,300.00 0 $0.00 1994 $3,290.10
<br /> 13 Salvage Existing GV and Box EA 2 $140.00 $280.00 0 $0.00 2 $280.00
<br /> 14 Common Excavation (P) CY 7295 $6.00 $43,770.00 0 $0.00 11408 $68,448.00
<br /> 15 Topsoil Borrow(LV) CY 660 $7.25 $4,785.00 0 $0.00 1018 $7,380.50
<br /> 16 Geotextile Fabric Type V SY 10560 $0.85 $8,976.00 0 $0.00 10503 $8,927.55
<br /> 17 Test Rolling STA 25.5 $50.00 $1,275.00 0 $0.00 . 25.5 $1,275.00
<br /> 18 Subgrade Preparation STA 1 25.5 $110.00 $2,805.00 0 $0.00 25.5 $2,805.00
<br /> 19 Aggregate Base, Class 5 TON 8100 $6.30 $51,030.00 0 $0.00 14208.6 $89,514.18
<br /> 20 _Aggregate Base,Class 5(100%Crushed Quarry Rock) TON 3500 $8.25 $28,875.00 0 $0.00 1970.59 $16,257.37
<br /> 21 8"Concrete Pavement SY 50 $44.00 $2,200.00 0 $0.00 82 $3,608.00
<br /> 22 1 '/2"Type 41A Bituminous Wear TON 710 $29.00 $20,590.00 798.27 $23,149.83 798.27 $23,149.83
<br /> 23 2"Type 31 B Bituminous Base TON 850 $28.00 $23,800.00 0 $0.00 941.08 $26,350.24
<br /> 24 Bituminous Tack Material GAL 410 $1.20 $492.00 435 $522.00 440 $528.00
<br /> 25 6"PE Perforated Drain Tile LF 3635 $3.75 $13,631.25 0 $0.00 3987 $14,951.25
<br /> 26 Drain Tile Cleanout EA 4 $500.00 $2,000.00 0 $0.00 1 4 $2,000.00
<br /> 27 Connect Drain Tile to Catch Basin I EA 6 $90.001 $540.00 0 $0.00 6 $540.00
<br /> SEH.RCM Page 1 Payment Application 5
<br />
|