My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11091999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 11091999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:10:25 PM
Creation date
12/30/2015 4:10:17 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 11091999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHI IT A <br /> Implementation Schedule for <br /> Sanitary Sewer System Improvements <br /> City of St Anthony,Minnesota <br /> Task Implementation Addresses <br /> No. Year Problem Task Description Comment Cost Opinion <br /> Area <br /> Completed with 1999 Street <br /> 1 1 1999 8 Replace sewer main on Wilson Street between 29th and the alley south of 27th. Improvement Project <br /> Reconstruct existing sewer line through alley between Wilson and Coolidge,north of St Completed with 1999 Street <br /> 2 1999 12 Anthony Boulevard Im rovement Project <br /> 3 1999 Complete and submit 1/1 Study to Metropolitan Council November 1999 <br /> 4 1999 Begin discussions with Minneapolis regarding sanitary bypass December 1999 <br /> Complete with street <br /> Connect manhole 296 to manhole 280 on Edward Street between St.Anthony Road and 33rd reconstruction project in the <br /> 5 2000 33&4 Avenue. (Possibly include with 33rd Avenue concrete rehab project) area $ 40,000 <br /> 6 2000 1 Upgrade Harding Street lift station $ 70,000 <br /> Re-route Harding Street lift station forcemain(Harding between 37th and 35th&35th between Includes significant street <br /> 7 2000 1 Harding&Roosevelt) restoration costs $ 200,000 <br /> 8 2000 5 Complete diversion to Minneapolis sewer (Through meter M105) $ 5,000 <br /> Investigate condition of Wilson Street sewer between 29th and 32nd(Possible replacement in <br /> 9 2000 6 the future with 2001 Street Improvement Project) Contract investigation work $ 5,000 <br /> Investigate condition of remaining portion of interceptor sewer from Wilson Street and 27th, <br /> south,then east and south down Coolidge to the south City limits.(Possible replacement in <br /> 10 2000 9 the future) Contract investigation work $ 5,000 <br /> Proposed for 2000 Street <br /> 11 2000 7 Reconstruct the existing sewer on 29th between Wilson and Silver Lake Road Improvement Project $ 250,000 <br /> Extend new 12-inch sewer east on 29th Avenue from Silver Lake Road to Old Highway 8 and Proposed for 2000 Street <br /> 12 2000 10& 11 divert flow from Old Highway 8 line west into new sewer line on 29th Improvement Project cl w/CIP No. 11 <br /> Preliminary Total Cost Estimate $ 575,000 <br /> I.%wpwin%1065,161Sewer CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.