Laserfiche WebLink
42 <br /> PRELEMNARY COST ESTIMATE <br /> Village Green <br /> Saint Anthony Village MN <br /> August 14, 2000 <br /> TASK UNIT QTY COST TOTAL <br /> Removal and demolition sf 24200 $0.50 $12,100.00 <br /> Topsoil or soil amendment cy 500 $20.00.$10,00(;.u0 <br /> Bituminous trail (8' width) sf 3360 $1.75 $5,880.00 <br /> Concrete curb and gutter(B612) if 420 $12.00 $5,040.00 <br /> Irrigation system sf 24200 $0.25 $6,050.00 - <br /> Sod sf 24200 $0.30 $7,260.00 <br /> Tree planting (4-1/2" cal. BB) ea 27 $750.00 $20,250.00 <br /> Sub-total $66,580.00 <br /> Contingency 10% $6,658.00 <br /> $73,238.00 <br /> Design and Engineering 15% $10,985.70 <br /> TOTAL $84,223.70 <br /> • <br />