Laserfiche WebLink
05/1`5/01 09:42 FAX 6123701378 BRW, INC. IM 003 <br /> • need to be read sometime in late spring/summer 2003,the construction . <br /> Since the playfields n Y <br /> schedule for the park shall start with the removals(fall 2001), field grading and soil modification <br /> (spring 2002), seeding of fields (summer 2002), and playfields turf establishment(summer 2002 <br /> to spring 2003). If the weather cooperates,we anticipate the playfields should be ready sometime <br /> late spring 2003 or summer 2003. <br /> Please review and make any changes necessary. <br />