Laserfiche WebLink
I PLANNING COMMISSION MEETING <br /> 2 OCTOBER 19, 1993 <br /> 3 PAGE 5 <br /> 4 <br /> 5 Mr . Freiberg advised that the pump island will be thirty eight <br /> 6 feet long . and needs four feet of canopy on each end to ' be <br /> .7 usable. The canopy facia will be thirty six' inches. high and <br /> 8 will be only decorative. No advertising nor signs will be <br /> 9 placed on the .canopy. The lights will shine down so they will <br /> 10 not interfer with any residences . There will be no junk cars <br /> 11 stored on the property and the roof signs will be removed. He <br /> 12 also stated that the .fencing will be changed and surface <br /> 13 blacktopping will be done next year when the weather is <br /> 14 better . <br /> 15 <br /> 16 The Public Hearing was closed at 7 : 28 p.m. <br /> 17 <br /> 18 Commissioner Franzese inquired if staff had researched this <br /> 19 request pertaining to any hardship. The City Manager responded <br /> 20 that the City Attorney had applied a "creative" interpretation <br /> 21 for other variances .granted to service stations . It was felt <br /> 22 this request could qualify for a hardship because of 'the <br /> 23 unusual shape of the lot . <br /> 24 <br /> 25 Commissioner Gondorchin inquired if there was going to be a <br /> 26 pylon sign . Mr. Freiberg stated there was . <br /> 27 <br /> 28 Motion by Franzese, second by Madden to recommend to the City <br /> 29 Council granting of the conditional use permit and the <br /> 30 variance to accommodate the expansion of the building 'and the <br /> 31 addition of a canopy as per the ' staff recommendations , there <br /> 32 was no one who appeared to speak against these requests , a <br /> 33 hardship exits because of the unusual shape of the lot and <br /> 34 including the following conditions : <br /> 35 <br /> 36 1 . Parking lot must be striped a minimum of eight spaces . <br /> 37 <br /> 38 2 . The canopy lighting must shine down <br /> 39 <br /> 40 3 . Inoperable vehicles may not be stored on the site for more <br /> 41 than two weeks . <br /> 42 <br /> 43 4 . Removal of roof sign <br /> 44 <br /> 45 5 . Where old chain link fence is currently located, new screen <br /> 46 fencing will be installed behind the building. <br /> 47 <br /> 48 6 . Complete paving on east side of building up to public- <br /> 9 right-of way. <br /> 5 , Motion carried unanimousl-S* <br />