Laserfiche WebLink
Mr. Michael J. Morrison <br /> May 1, 1997 <br /> Page 2 <br /> Alternative `B' shows a long term reconfiguration of the three ball fields to better <br /> meet the needs of multiple user groups and accommodate soccer fields in a <br /> portion of the outfield areas. The plan also suggests a reconfiguration of the <br /> northern parking lot,play area,sand volley ball court and a relocation of the <br /> sledding hill. These changes are necessitated by the redesign of the ball fields. <br /> Approximately 65 parking spaces would be displaced as part of this redesign. <br /> Preliminary construction costs for Alternative `B' are estimated to run <br /> approximately$450,000 not including building demolition or construction of the <br /> bandstand. <br /> Alternative `C' illustrates a more ambitious long term plan for the entire park <br /> including two of the high school athletic fields. The plan organizes the ball fields <br /> in a radial pattern around a new concessions/restroom building. The sledding hill <br /> remains in its present location and the northern parking lot ,play area and volley <br /> ball are reconfigured as part of this design. Preliminary construction costs for <br /> Alternative `C' are estimated to run approximately$550,000 not including <br /> building demolition or construction of the bandstand. <br /> I look forward to discussing these alternatives with you and the City Council next <br /> week. If you have any questions please call me at 373-6421. <br /> Respectfully, <br /> BR`V, INC. <br /> Bob Kost,ASL <br /> Project Manager <br /> BK/dc <br /> Enclosures <br /> cc: Suzanne Rhees <br /> 35185-001-9901 <br /> RK7%fOR.VS.LTR <br />