My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08191997
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1997
>
PL PACKET 08191997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:34:22 PM
Creation date
12/30/2015 5:34:17 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1997
SP Name
PL PACKET 08191997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Regular Meeting Minutes <br /> July 15, 1997 <br /> Page 7 <br /> 1 Mr. Weber explained that moving the Public Works site and replacing it with a park would <br /> 2 solidify and stabilize the neighborhood south of the railroad tracks. There is currently an <br /> 3 uneasy mixture of residential and industrial in that area. He suggested the area move toward <br /> 4 the direction of residential as it is not a long-term strong industrial area. <br /> 5 Mr. Weber stated that monitoring of the St. Anthony Shopping Center should be included in <br /> 6 the Plan Update. He suggested the use of this site possibly should be changed over the next <br /> 7 decade. <br /> 8 City Manager Morrison clarified that a Parks Task Force is being developed, and that the <br /> 9 agencies currently running the park system will continue to do so. He also noted that while <br /> 10 moving the Public Works site does have merit, there is industry that is anxious to expand in <br /> 11 that area. <br /> 12 George Wagner, Task Force Member, suggested that the spelling of St. Anthony be kept <br /> 13 consistent with either "St." or "Saint". <br /> 14 Mornson noted that at the beginning of the Comprehensive Plan Update process, one of the <br /> 15 recommendations was potential suggestions of verbiage change to the ordinance. He noted <br /> 16 there were no changes recommended and asked if this meant there were no conflicts <br /> 17 discovered. <br /> 18 Ms. Rhees stated that detailed changes to the zoning ordinance text may not come up in a <br /> 19 Comprehensive Plan review. If there are future land use changes, they will result in changes <br /> 20 to the zoning map but this will depend on market forces and time. <br /> 21 It was noted that traffic circles require a lot of land. <br /> 22 Mr. Weber stated 29th Avenue was a broad intersection. He was not certain if any private <br /> 23 land would need to be acquired but if any was needed it would be a minimal amount. <br /> 24 Ms. Rhees explained the new design of traffic circles is smaller and designed more for use on <br /> 25 a local street. <br /> 26 Jerry Faust, Task Force Member, asked how a traffic circle would enhance traffic flow. <br /> 27 Ms. Rhees stated traffic circles are designed to keep traffic moving at a reasonable speed. <br /> 28 Traffic circles and neck-downs at corners slow traffic but traffic flows through more readily <br /> 29 than by use of a stop sign or traffic signal. <br /> 30 Chair Bergstrom stated he had spoken with a traffic engineer who drives 29th Avenue <br /> 31 everyday, and he stated that a traffic circle, with the proper design, in this area could control <br /> 32 the volume of traffic in the area even better than a traffic signal. The engineer stated he felt <br /> 33 that at that intersection a significant area of land would have to be removed to install a traffic <br />
The URL can be used to link to this page
Your browser does not support the video tag.