My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08181998
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1998
>
PL PACKET 08181998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:36:40 PM
Creation date
12/30/2015 5:36:33 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1998
SP Name
PL PACKET 08181998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> ' � t <br /> Page 6 <br /> 4) Schedule of anticipated starting and completion date of each land <br /> disturbing activity including the installation of construction site.erosion <br /> control measures needed.to meet the requirements of this ordinance. <br /> 5) Provisions for maintenance of the construction site erosion control <br /> measures during construction. <br /> C) Plan of final site conditions. A plan of final site conditions on the same scale as <br /> the existing site map showing the site changes including: <br /> 1) Finished grading shown at.contours at the same interval as provided <br /> above or as required to clearly indicate the relationship of proposed <br /> changes to existing topography and remaining features. <br /> 2) A landscape plan, drawn to an appropriate scale, including dimensions <br /> and distances and the location, type, size and description of all proposed <br /> landscape materials which will be added to the site as part of the <br /> development. <br /> 3) A drainage plan of the developed site delineating in which direction and <br /> at what rate storm water will be conveyed from the site and setting forth <br /> the areas of the site where storm water will be allowed to collect. <br /> 4) The proposed size, alignment and intended use of any structures to be <br /> erected on the site. <br /> 5) A clear delineation and tabulation of all areas which shall be paved or <br /> surfaced, including a description of the surfacing material to be'used. <br /> 6) Any other information pertinent to the particular project which in the <br /> opinion of the applicant is necessary for the review of the project. <br /> 1675.07. Plan Review Procedure. <br /> Subd. 1. Process. Storm water management plans.meeting the requirements of Section <br /> 1675.06 shall be submitted by the Public Works Director to the Planning Commission <br /> for review in accordance with the standards of Section 1675.08. The Commission shall <br /> recommend approval, recommend approval with conditions, or recommend denial of <br /> the storm water management plan. Following Planning Commission action, the storm <br /> water management plan shall be submitted to the City Council at its next available <br /> meeting. City council action on the storm water management plan must be <br /> accomplished within 120 days following the date the application-for approval is filed . <br /> with the Public Works Director. <br />
The URL can be used to link to this page
Your browser does not support the video tag.