Laserfiche WebLink
I then met with Jay Hartman, the Public Works Director and he said he would have someo n' e <br /> from Public-Works measure the right-of-way for me. It was at that point that I learned that the <br /> right-of way on Silver Lake Road is 33 feet (half of the road width, which is 63 feet). <br /> When I returned from vacation on February 1"', 1 was told that the Public Works staff had <br /> measured the sign at 29 feet from the road centerline, making the sign 4 feet in, the right-of-way. <br /> Mr. Hansen called me either that day or the next, demanding to know why no one had called <br /> him back with the 'information he had requested.- When I tried to explain to him and give him <br /> the information, he wouldn't let me speak. He was so upset that no one had called him, so I just <br /> listened to him until he hung up. <br /> I have attached a copy of the original sign permit and plans to this report. <br />