Laserfiche WebLink
Parks Commission Meeting Minutes <br /> January 8, 2001 <br /> Page 4 <br /> 1 Zurbey asked how the subcommittees would be able to respond to all the questions of the community <br /> 2 and staff. Mr. Hubmer indicated the subcommittees would have to wprk through Mr. Hartman to <br /> 3 reach BRW with.all questions and concerns. <br /> 4 Mr. Hubmer noted he would need direction from the.Commission on the pavilion and concession <br /> 5 stand. He stated the north end of the park was still in flux. Mr.Hubmer encouraged the Commission <br /> 6 to take their time with designing and placing the pavilion within the park. Mr. Hubmer indicated <br /> 7 the shape, size and location of these footprints would need to be noted before BRW could finalize <br /> 8 the park layout plans and commence bidding. <br /> 9 Mr. Hartman asked for a final date on having the size and-footprint of the pavilion and concession <br /> 10 stand. Mr. Hubmer indicated he would need this information by the February.meeting. <br /> 11 Zurbey indicated he did not feel it would be possible to have this information by February. Mr. <br /> 12 Hartman stated he felt this would be possible if the subcommittees were to meet several times <br /> 13 between now and the February meeting. He indicated if the subcommittees meet and have <br /> 14 presentations at the next meeting,the rest of the park would not be held up any,further. <br /> 15 Mr.Hartman asked if the buildings would be under a separate contract or within the bid of the entire <br /> 16 : parka Mr..Hubmer stated the Park Commission would be better served with-the buildings as a <br /> 17 separate contract to allow the Commission time to resolve the pavilion and concession stand issues. <br /> 18 He noted the Park Commission would not be spending any more money if the project was done in <br /> 19 conjunction with the park or completed separately. <br /> 20 Mr.Hubmer indicated the City has allotted$180,000 for the building construction and engineering. <br /> 21 He noted if the City chooses not to use BRW for the pavilion and concession stand those funds <br /> 22 would be allocated to the firm the Park Commission chooses. <br /> 23 Mr. Hubmer reviewed the Phase I Environmental plans with the Park Commission. He noted the <br /> 24 MPCA has been alerted him of borings from this site which were.questionable. Mr.Hubmer stated <br /> 25 the City would be entering in the VIC program with the MPCA to clean up the Central Park site if <br /> 26 needed. He noted the site has been capped at this time with four feet of clay to allow for the use of <br /> 27 the ball fields: <br /> 28 Jenson asked how deep the borings were at Central Park. Mr. Hubmer indicated the borings were <br /> 29 approximately 25 feet at the Central Park site. He noted the Phase II Environmental study would <br /> 30 greater define the area of contamination and the actions that the City would need to take. <br /> 31 Jindra asked if the sledding hill would be kept intact. Mr. Hubmer stated there would be a ten foot <br /> 32 vertical change and a five foot section would be eliminated on one side of the hill. <br />