My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05152001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 05152001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:40:28 PM
Creation date
12/30/2015 7:40:21 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 05152001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sign Subcommittee Meeting Summary—March 14,2001 <br /> The sign subcommittee met to discuss issues with regard to placing a monument sign <br /> with electronic capabilities near the community center. Two possible locations were <br /> identified. The first location is located west of the tennis courts and oast of the holding <br /> pond. The second location is north of the community center parking lot and south of the <br /> Central Park parking lot on the island that separates them. The subcommittee <br /> recommends the placement of the sign by the tennis courts due to the following reasons: <br /> • The south location provides the space to further enhance the look of the sign by <br /> incorporating a landscaping plan that could include a retaining wall, flowers, and <br /> shrubs. The confined space at the north site will likely limit enhancements such as <br /> these. <br /> • This site will allow for a larger sign than the north location. <br /> • This site makes good use of a piece of land that otherwise has limited possibilities. <br /> • The site seems to provide for a better location that identifies not only city hall,but the <br /> entire campus the city manages, such as Water Tower Park, Central Park,the <br /> Community Center,public services, etc. <br /> The committee suggests the city hire a consultant t6provide input with regard'to updating <br /> of the sign portion of the code. Some issues within the code that need to be addressed <br /> include: <br /> • Defining electronic signs, expanding their use, and establishing standards for <br /> maintenance and operation <br /> • Eliminating the use of temporary signs <br /> • Incorporate design standards for future signs <br />
The URL can be used to link to this page
Your browser does not support the video tag.