My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05152001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 05152001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:40:28 PM
Creation date
12/30/2015 7:40:21 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 05152001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Commission Meeting Minutes <br /> May 1, 2001 <br /> Page 5 <br /> 1 Chair Jindra identified three sources whose support is critical: the City Council,the school,and the <br /> 2 Sports Boosters. Commissioner Gebhardt indicated that.the contaminated soil is standing as a major <br /> 3 problem right now,and that those groups need to understand that. <br /> 4 The Commission discussed their options. <br /> 5 Mr. Kost stated that the Engineers Estimate was $1,855,834. He indicated that after they factor in <br /> 6 the additions and deductions, the total is $1,747,614. <br /> 7 Commissioner Zurbey suggested that the Commission determine where they could change the specs <br /> 8 in order to reduce the cost of this project. Mr. Kost suggested reducing the soil profile by half, to <br /> 9 $300,000. However, he stated that he did not want to see the soil depth go below 8 inches. <br /> 10 The Commission decided that all would attend the next City Council meeting where the bids would <br /> 11 be presented. <br /> 12 <br /> 13 Motion by Ganley to proceed with option A: the low bid from Veit and Company which represents <br /> 14 $1,915,567, 11% over the engineers estimate. <br /> 15.- Motion carried unanimously. <br /> 16 V. REPORTS. <br /> 17 A. Community Services. <br /> 18 None. <br /> 19 B. School Board. <br /> 20 None. <br /> 21 C. Snorts Booster. <br /> 22 George Zurbey indicated that they informed everyone that they can not schedule time for <br /> 23 the use of the athletic field after May 3 V. Commissioner Jenson asked the Commission <br /> 24 if it were possible to use the field two days after the scheduled close date for an alumni <br /> 25 football game. <br /> 26 <br /> 27 VI. OTHER BUSINESS. <br /> 28 Chair Jindra asked if everyone had a chance to go down to Silver Point Park and see where Ms. <br /> 29 Olivier had sectioned off an area to show where the storage and mechanical area would be <br /> 30 located. The storage and mechanical area was moved to the front of the building with an <br /> 31 overhang, where it will not affect the path. <br /> 32 Chair Jindra reviewed the changes Ms. Olivier made to the Central Park Pavillion, where she has <br /> 33 put some of the mechanical and storage space up above, which should reduce the price a little <br /> 34 more. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.