My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 04202003
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2003
>
PL PACKET 04202003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:45:00 PM
Creation date
12/30/2015 7:44:54 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 04202003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-ALAN : FREEDOM.i -SERMRS <br /> SHEET NO. SHEET INDEXZ10 A Z10 6 Z10 - C <br /> O NT'• COVER SHEET <br /> the F RE M 1.2 CONSTRUCTION NOTES <br /> 1.5 CONSTRUCTION NOTES <br /> 2.1 FOUNDATION PLAN - BASEMENT <br /> GENE RAL NOTES : 2.6 FOUNDATION DETAILS <br /> 3.0 BASEMENT PLAN - BASEMENT <br /> . <br /> -All work shall comply with the 2000 International Residential Code, Applicable Local, State, County 3.1 FIRST FLOOR PLAN <br /> and Federal Codes, Ordinances, Laws, Regulations and Protective Covenants governing the site of work. 3.1.1 FIRST FLOOR PLAN OPTIONS <br /> -All Con actors shall furnish all labor, equipment, materials, and perform all work necessary, indicated, 3.2 SECOND FLOOR PLAN <br /> reasnably inferred or required by any code with jurisdiction to complete their scope of work. 4.2.1 ROOF PLAN B <br /> - Ons.ite verification of all dimensions and conditions shall be the responsibility of the Contractor. 6.2,1 FRONT 4 REAR ELEVATIONS B <br /> Noted dimensions take precedent over scale. Each Contractor shall report to the Field Manager any 6,2.2 SIDE ELEVATIONS B <br /> discrepancy or other questions pertaining to the working drawings and/or specifications -7.2.1 BUILDING SECTIONS B <br /> as detailed in the construction agreement. -7.2.2 BUILDING SECTIONS B <br /> -All alternates and finishes are at the option of the owner and shall be constructed in addition to or in lieu of the SECOND FLOOR ELECTRICAL LAYOUTS <br /> typical condition as per the specific job site selections and addendum available through the Field Manager. 8 O BASEMENT, FIRST E5.1 BASEMENT, FIRST $ SECOND FLOOR MECHANICAL LAYOUTS <br /> - Each Contractor shall be responsible for all work as outlined in the scopes of work, specifications and exhibits, q O KITCHEN � BATH PLAN DETAILS <br /> as detailed in the construction agreement by and between Contractor and Centex Homes D.I DETAILS <br /> D.2 DETAILS <br /> AREA SCHEDULE D.3 DETAILS <br /> LOWER LEVEL 1376 D.4 DETAILS <br /> D.5 DETAILS <br /> MAIN LEVEL 1376 �1.q'1 D.6 DETAILS <br /> `s UPPER LEVEL D.8 DETAILS <br /> TOTAL.-LIVING AREA 2783 D.10 DETAILS <br /> D.11 DETAILS W <br /> TOTAL CONDITIONED AREA 4159 D.12 DETAILS W <br /> W <br /> GARAGE 443 D.13 DETAILS = <br /> D.14 DETAILS <br /> D.15 DETAILS <br /> D.16 FIREPLACE DETAILS W <br /> O <br /> U <br /> mom: <br /> �.: <br /> de��aaby. <br /> dmw by. <br /> the kr d by. <br /> date: � <br /> sheet: <br /> J <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.