My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05182004
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2004
>
PL PACKET 05182004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:45:11 PM
Creation date
12/30/2015 7:45:04 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 05182004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-P LAN : F 1R E E D-0 M.'. :--S E R1 ES <br /> t Z10AC 5HEET NO. SHEEN INDEX <br /> Z10=A Z10mB <br /> th "FREMONT" COVER SHEET <br /> e 1.2 CONSTRUCTION NOTES <br /> 1.5 CONSTRUCTION NOTES <br /> NOTES . 2.1 FOUNDATION PLAN - BASEMENT <br /> GENERAL 2.6 FOUNDATION DETAILS <br /> z 1, 5.0 BASEMENT PLAN - BASEMENT <br /> -All work:sall comply with the 2000 International Residential Code, Applicable Local, State, County 5.1 FIRST FLOOR PLAN <br /> and Fed6ral Codes, Ordinances, Laws, Regulations and Protective Covenants governing the site of work. 5.1.1 FIRST FLOOR PLAN OPTIONS <br /> -All Contractors shall furnish all labor, equipment, materials, and perform all work necessary, indicated, 5.2 SECOND FLOOR PLAN <br /> reasonably inferred or required by any code with jurisdiction to complete their scope of work. 4.2.1 ROOF PLAN B <br /> -On site verification of all dimensions and conditions shall be the responsibility of the Contractor. 6.2.1 FRONT a REAR ELEVATIONS B <br /> Noted dimensions take precedent over scale. Each Contractor shall report to the Field Manager any 6.2.2 51DE ELEVATIONS B <br /> discrepancy or other questions pertaining to the working drawings and/or specifications -7.2.1 BUILDING SECTIONS B <br /> as detailed in the construction agreement. -7.2.2 BUILDING SECTIONS B <br /> -All alternates and finishes are at the option of the owner and shall be constructed in addition to or in lieu of the 8 O BASEMENT, FIRST � SECOND FLOOR ELECTRICAL LAYOUTS <br /> typical condition as per the specific job site selections and addendum available through the Field Manager. 8 I BASEMENT, FIRST SECOND FLOOR MECHANICAL LAYOUTS <br /> - Each Contractor shall be responsible for all work as outlined in the scopes of work, specifications and exhibits, <br /> as detailed in the construction agreement by and between Contractor and Centex Homes q.0 KITCHEN BATH PLAN DETAILS <br /> D.I DETAILS <br /> 0.2 DETAILS <br /> AREA SCHEDULE D.5 DETAILS <br /> LOWER LEVEL 1376 DA DETAILS <br /> D.5 DETAILS _ <br /> MAIN LEVEL 1376 �1wq1 D.6 DETAILS <br /> UPPER LEVEL D.8 DETAILS <br /> TOTAL.-LIVING AREA 2783 0.10 DETAILS <br /> DETAILS <br /> TOTAL CONDITIONED AREA 4159 D.I I DDW <br /> D. ETAILS W <br /> GARAGE 443 D.I- DETAILS = <br /> D.14 DETAILS U) <br /> D.IS DETAILS cl� <br /> D.16 <br /> FIREPLACE DETAIL5 j <br /> O <br /> tlt mown by <br /> designed by. <br /> dre by. <br /> hedwd by. <br /> date: 2-2406 <br /> sheet: <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.