My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 11101987
StAnthony
>
City Council
>
City Council Minutes
>
1987
>
CC MINUTES 11101987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:46:51 PM
Creation date
12/30/2015 5:46:49 PM
Metadata
Fields
SP Box #
21
SP Folder Name
CC MINUTES AND AGENDAS 1987
SP Name
CC MINUTES 11101987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 P.U.D. Amendments Accepted for P. J. Gaughan Proposal for Kenzie <br /> 2 Terrace Redevelopment Project <br /> 3 Commissioner Wagner prefaced his report on the above by offering his <br /> 4 congratulations to the staff and Council for scheduling a good <br /> 5 neighbor communication meeting before the Planning Commission hearing, <br /> 6 which he perceived had expedited the public hearing process and <br /> 7 resulted in no real concerns or objections to the project being <br /> 8 vocalized during the hearing. The Commissioner stated that it was a <br /> 9 privilege for him to be able to present what he perceived was finally <br /> 10 a solution to previous problems with getting a workable project for <br /> 11 the final phase of this redevelopment endeavor. <br /> 12 The Gaughan proposal was well received by the Commissioners, and the <br /> 13 few residents who participated in the discussions, according to <br /> 14 Commissioner Wagner, who then reported the Commission' s recommendation <br /> 15 related to the variances to the P.U.D. which would be necessary for <br /> 16 the Council to grant before the project could go forward. The <br /> 17 Commissioner then pointed out that the variance having to do with the <br /> 18 setbacks resulting from having to resite the building after a new <br /> 19 survey was made had not been specifically stated as intended in the <br /> 20 Commission' s recommendation of approval. The designation of hours <br /> 21 when construction would be restricted was also corrected to indicate <br /> 22 no disruption of the neighborhood would be allowed during the evening <br /> •23 or early morning hours. <br /> 24 Consultant ' s Report Accepted for Council Approval <br /> 25 Councilmembers had been provided with copies of a 4 page memorandum <br /> 26 from Mr. Krier in which the H.R.A. Consultant had made some recommen- <br /> 27 dations based on his review of the site and had cleared with the <br /> 28 redeveloper which Mr. Childs indicated he thought should be incor- <br /> 29 porated into the Council ' s motion of approval. <br /> 30 Mr. Krier reported "monumental" problems with the legal description of <br /> 31 the property and the survey which Arkell had used for the project, <br /> 32 which had not been resolved until after the Planning Commission <br /> 33 hearing. These included a loss of 40 feet on the Kenzie Terrace side, <br /> 34 Mr. Hamel said. <br /> 35 Even though there was now less land to work with than originally <br /> 36 planned for, the H.R.A. Consultant reported the developer had been <br /> 37 able to redraw the site plans in such a manner as to require no <br /> 38 setback variances , except for the side of the building closest to the <br /> 39 vacated Coolidge Street, however, where there would be ample space <br /> 40 between the structure and the proposed public walk. <br /> 41 Mr. Krier specifically discussed some of his recommendations, includ- <br /> 42 ing the redesigning and signalization of the Kenzie Terrace intersec- <br /> 43 tion between the project and the Kenzington accesses which had been <br /> •44 proposed by the Rieke Carroll Muller traffic engineer during his <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.