Laserfiche WebLink
1 REGULAR COUNCIL MEETING <br /> • 2 JANUARY 28 , 1992 <br /> 3 PAGE 7 <br /> 4 <br /> 5 <br /> 6 <br /> 7 Motion carried unanimously <br /> 8 <br /> 9 <br /> 10 b. Consideration of Quotations for Grouting and Patching of <br /> it Pipe for the Hiahcrest Project- <br /> 12 <br /> 13 The City Manager requested this item be taken off the <br /> 14 agenda as he felt more information was necessary. <br /> 15 <br /> 16 Motion by Marks , second by Wagner to not consider this <br /> 17 item. <br /> 18 <br /> 19 Motion carried unanimously <br /> 20 <br /> 21 <br /> 22 C. Consideration of a Change Order for New Pipe Sections for <br /> 23 the Hiahcrest Project <br /> 24 <br /> 25 Motion by Wagner, second by Fleming to authorize the <br /> 26 change order for new pipe sections for the Highcrest <br /> 47 Project as recommended by Barr Engineering. <br /> 8 <br /> 29 The City Manager advised that an oval pipe was installed <br /> 30 and there will be a need for additional work and costs to <br /> 31 repair certain sections of the pipe. He felt it would not <br /> 32 be cost effective to replace the entire pipe at the <br /> 33 present time as it is very expensive. <br /> 34 <br /> 35 <br /> 36 Motion carried unanimously <br /> 37 <br /> 38 <br /> 39 <br /> 40 d. Consideration of a Petition for Construction of the <br /> 41 Silver Lake Water Quality Protection Project <br /> 42 <br /> 43 Motion by Enrooth, second by Ranallo to approve <br /> 44 submission of a petition to the Rice Creek Watershed <br /> 45 District for construction of the Silver Lake Water <br /> 46 Quality Protection Project . <br /> 47 <br /> 48 The City Manager advised that this petition will be <br /> 49 presented at a meeting at Shoreview City Hall on February <br /> 50 12 , 1992 which will convene at 7 : 00 p.m. <br /> 51 <br /> 52 The contents of the petition is requesting that Silver <br /> 0-3 Lake be -cleaned up by various methods. One of the methods <br /> 54 is an aeriation device which would avoid winter kill from <br />