Laserfiche WebLink
REGULAR COUNCIL MEETING <br /> 2 MAY 25, 1993 <br /> 3 PAGE 5 <br /> 4 <br /> 5 Mr . Madigan also explained the statutorial requirements which <br /> 6 must be met for a project to be an assessable project . He <br /> 7 advised that tonight there are two public hearings being held, <br /> 8 one for the project and one for the assessment . <br /> 9 <br /> 10 Mr . Cochrane questioned the need for the project . He felt the <br /> 11 street condition was not bad enough to warrant replacement . <br /> 12 Mr . Madigan responded that some of the decision is based on <br /> 13 science and some is also subjective and based on judgement and <br /> 14 experience . It was also noted that the street surface has <br /> 15 bumps , cracks, holes and its driveability is affected. There <br /> 16 also appears to be consideable movement of the sewer pipes <br /> 17 beneath the street . This was detemined with televising the <br /> 18 pipes . <br /> 19 <br /> 20 Joe Sevick , 3505 31st Avenue, inquired if his inground <br /> 21 sprinkler system will be affected with this reconstruction. <br /> 22 The sprinkler heads are directly adjacent to the curb. Mr . <br /> 23 Madigan advised there will be a on-site inspector for this <br /> 24 project and Mr . Sevick should make this person aware of the <br /> 25 sprinkler system. The contractor should be advised of any <br /> �6 situations which may be affected by the project . Mr . Sevick <br /> was also advised by staff he should deal directly with the <br /> 28 contractor regarding his intention to do some cement work on <br /> 29 his driveway. <br /> 30 <br /> 31 Michael Bye, 3024 Croft Drive, noticed there was a <br /> 32 considerable drop in the reconstruction costs from the <br /> 33 estimated costs . He inquired if there was also a decrease in <br /> 34 the overlay costs . Mr . Madigan advised there was an error made <br /> 35 in the cost sheet for the overlay project . It was figured at <br /> 36 a 35/65 % split which was incorrect . It should have been a <br /> 37 50/50% split . <br /> 38 <br /> 39 Mr . Bye also noted that an overlay could be done on his street <br /> 40 ten times for what the reconstruction is costing. He was <br /> 41 advised that ten layers of bituminous could not be applied to <br /> 42 the street as it would be so high it would not be drivable . <br /> 43 <br /> 44 Councilmember Enrooth explained that a reconstruction project <br /> 45 does more than replace the surface of a street such as the <br /> 46 overlay. He noted the sewer and water services are also <br /> 47 replaced and the street is reconstructed whereby the subgrade <br /> 48 and base under the street is replaced. The sewer pipe on this <br /> 49 street has been viewed and it moves a great deal as the area <br /> 50 is not secure . <br />